Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Confectionery with capacity for 500 Kg/day.
CODE - TRG-116
Ready project Confectionery with capacity for 500 Kg/day.
CODE - TRG-116
Project ready with:
Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cold Chamber
Offices
Canteen
Dressing Room
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Confectionery
OPTIONAL SERVICES:
Financial Feasibility Study of Confectionery with capacity for 500 Kg/day.
Business plan for Confectionery with capacity for 500 Kg/day.
3D project of Confectionery with capacity for 500 Kg/day.
Projects with other capacities
Confectionery
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Tips on How to Open a Bakery
|
Tips for Confectionery Facades
|
Equipment and facades of confectioneries
|
Confectionery - Interior Design
|
Machine Tips for Setting Up a Bakery
|
Open a Bakery
|
Ready-made Pastry Business Plan
|
Tips for Setting Up a Bakery
|
Confectionery Business Plan Template
|
How to Get Financing from BNDES for a Pharmacy
|
Tips on How to Set Up a Bakery
|
How to Set Up a Bakery in a Countryside Town
|
Setting Up a Bakery Facade
|
Confectionery Plants
|
Tips on How to Set Up a Bakery
|
Business Plan for a Sweet Shop
|
Confectionery Interior Design Models
|
Make a Plan for a Sweet Shop Online
|
Interior Design of Sweet Shops
|
Interior Layout Service Provider Business Plan
|
Flowchart for Confectionery
|
Pastry Shop Interior Layout
|
Interior Design Projects Confectionery
|
Confectionery Ideas
|
Investments to Open a Bakery
|
Tips for Setting Up a Bakery
|
*business plan for a confectionery shop*
|
Tips for Setting Up a Bakery and Confectionery Shop
|
Interior Design Models for Bakeries
|
Tips on How to Set Up a Bakery
|
How to Create a Plan for a Bakery
|
Models of facades of sweet shops
|
Confectionery Facade Models
|
Confectionery Interiors
|
Tips for Confectionery Facades
|
Platas Confectionery
|
Tips for Opening a Bakery
|
Confectionery Facade Model
|
Torteria Floor Plan
|
Financing Confectionery
|
Pastry Shop Tips for Setting Up
|
Building a Bakery
|
Bakery Facade Model
|
Bakery Decoration Design Tips
|
How Much Does It Cost to Slaughter Poultry in China
|
Setting Up a Cosmetics Industry
|
Floor Plan of Sheep Farming Facilities
|
Setting Up Feed Store
|
Windshield Replacement Workshop
|
Selling Chicken for Roasting
|
See Fishmonger Equipment
|
Bathroom Box Assembly
|
Teenage Clothing Store Design In 3d
|
Organizational Chart of a Drug Distributor
|
Fish Distributor Business
|
Build School Floor Plan
|
How to Set Up a Small Cattle Slaughterhouse
|
Where to Buy Ready-Made Snacks
|
Pig Farming Business Plan
|
Maternity Wards Under Construction
|
Technical Project for Healthcare Services
|
Ps Children's Flowchart
|
Floor Plan Layout of Your Gym's Weight Room
|
Model of a Hotel Floor Plan
|
Business Plan Restaurants Food By Kilo
|
How to Set Up a Nightclub for 200 People
|
Build a Car Wash
|
Buffet Flowchart
|
Physiological Serum Business Plan
|
Opening a Jackhammer
|
Business Plan Template for Clothing Industry
|
Business Description Leather Glove Manufacturing
|
Plant for Mini Dairy
|
The Making of a Magnifying Glass
|
Work on a Toy Assembly Factory
|
Body Model
|
How to Open a Cement Artifacts Factory
|
How to Open - Set Up a Kite Factory
|
Physical Financial Schedule for Aluminum Metalworking
|
Small Machining Company Management
|
Main Equipment for Prosthetics Laboratory
|
Long Life Milk Production Project
|
Restaurant Good Manufacturing Practices Manual Template
|
Equipment for Setting Up a Hot Dog Shop
|
Standard Operating Procedure Sales Area
|
Veterinary Standard Operating Procedure
|
Floor Plan Photo Studio
|
Manicure Service Provision Contract Template
|
Organizational Chart of a Travel Agency
|
Accounting Office Layout
|
Fire Ready Project
|
P2f Account Plan for Pig Farming
|
Production Planning in Confectionery
|
Natural Snack Models
|
Shredded Coconut Factory
|
Grain Storage Project Floor Plan
|
How to Set Up a Dried Tomato Industry
|
Bone Scrap Leather
|
Other projects ready:
How to start Factory to Produce Organic Cachaça (Liquor) with capacity for 1.000 liters/day.
Project Factory to Produce Macaroni (Automatic Line) with capacity for 20.000 kg/day.
PDF Factory to Produce Ready Seasoning with capacity for 1.000 Kg per day.
Plant and layout Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 800 animals/day.
Project Factory to Produce Natural Liquid Smoke (to be used in Smoked Products) with capacity for 300 Kg/day.
Project Tannery Caprine Skin with capacity to Produce 100 skins/day.
FeasibilityFactory to Produce Crystallized Candies with an area of 400 m² and capacity for 8.000 kg/day.
Business plant Factory to Produce dand White Wine (Prosecco) of Honey with capacity for 300 liters/day.
Project Slaughterhouse Ostrich Slaughter with capacity for 300 animals/day.
How to start Factory to Produce Fruit Cordial and Powder Juice with capacity for 100 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US