Ready project Confectionery with capacity for 500 Kg/day.

CODE - TRG-116

Ready project Confectionery with capacity for 500 Kg/day.

CODE - TRG-116


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cold Chamber
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Confectionery

How to start Confectionery with capacity for 500 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Confectionery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tips for Opening a Bakery | Pastry Shop Interior Layout | Tips on How to Set Up a Bakery | Equipment and facades of confectioneries | Building a Bakery | Confectionery Facade Model | *business plan for a confectionery shop* | Tips for Setting Up a Bakery | Confectionery Plants | Tips for Confectionery Facades | Platas Confectionery | Tips for Confectionery Facades | Bakery Facade Model | Interior Layout Service Provider Business Plan | Confectionery Interiors | Business Plan for a Sweet Shop | Confectionery Interior Design Models | Flowchart for Confectionery | Pastry Shop Tips for Setting Up | Confectionery Facade Models | How to Set Up a Bakery in a Countryside Town | Tips on How to Set Up a Bakery | Open a Bakery | Bakery Decoration Design Tips | Confectionery - Interior Design | Models of facades of sweet shops | Machine Tips for Setting Up a Bakery | Investments to Open a Bakery | How to Create a Plan for a Bakery | Interior Design Projects Confectionery | Interior Design Models for Bakeries | Confectionery Business Plan Template | Tips on How to Open a Bakery | Financing Confectionery | Make a Plan for a Sweet Shop Online | Ready-made Pastry Business Plan | Tips for Setting Up a Bakery and Confectionery Shop | Tips on How to Set Up a Bakery | How to Get Financing from BNDES for a Pharmacy | Tips for Setting Up a Bakery | Torteria Floor Plan | Setting Up a Bakery Facade | Interior Design of Sweet Shops | Confectionery Ideas | How Much Does It Cost to Slaughter Poultry in China | Setting Up a Cosmetics Industry | Floor Plan of Sheep Farming Facilities | Setting Up Feed Store | Windshield Replacement Workshop | Selling Chicken for Roasting | See Fishmonger Equipment | Bathroom Box Assembly | Teenage Clothing Store Design In 3d | Organizational Chart of a Drug Distributor | Fish Distributor Business | Build School Floor Plan | How to Set Up a Small Cattle Slaughterhouse | Where to Buy Ready-Made Snacks | Pig Farming Business Plan | Maternity Wards Under Construction | Technical Project for Healthcare Services | Ps Children's Flowchart | Floor Plan Layout of Your Gym's Weight Room | Model of a Hotel Floor Plan | Business Plan Restaurants Food By Kilo | How to Set Up a Nightclub for 200 People | Build a Car Wash | Buffet Flowchart | Physiological Serum Business Plan | Opening a Jackhammer | Business Plan Template for Clothing Industry | Business Description Leather Glove Manufacturing | Plant for Mini Dairy | The Making of a Magnifying Glass | Work on a Toy Assembly Factory | Body Model | How to Open a Cement Artifacts Factory | How to Open - Set Up a Kite Factory | Physical Financial Schedule for Aluminum Metalworking | Small Machining Company Management | Main Equipment for Prosthetics Laboratory | Long Life Milk Production Project | Restaurant Good Manufacturing Practices Manual Template | Equipment for Setting Up a Hot Dog Shop | Standard Operating Procedure Sales Area | Veterinary Standard Operating Procedure | Floor Plan Photo Studio | Manicure Service Provision Contract Template | Organizational Chart of a Travel Agency | Accounting Office Layout | Fire Ready Project | P2f Account Plan for Pig Farming | Production Planning in Confectionery | Natural Snack Models | Shredded Coconut Factory | Grain Storage Project Floor Plan | How to Set Up a Dried Tomato Industry | Bone Scrap Leather |

 

Other projects ready:

How to start Factory to Produce Soy Milk with capacity for 1.000 liters per day.
Project Factory to Produce Toothpaste with capacity for 300 Kg/day.
PDF Factory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 30.000 bandages per day.
Plant and layout Slaughterhouse and Farm for Quails with capacity for 10.000 birds/day.
Project Footwear Industry to Produce Boots with capacity for 100 pairs/day.
Project Slaughterhouse Horses with capacity for 10 animals per day.
FeasibilityFactory to Produce Artificial Candles with capacity for 1.000 Kg/day.
Business plant Shed for Bovine Confinement (Milk Cattles) in a Confinement Regime, with capacity for 250 animals and area of 1.000 m² and Mecanic Milking for 12 animals (area with 400 m²) and Milk Packaging (TYPE A MILK).
Project Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 10.000 Kg per day.
How to start Factory to Produce Vinegar made from Apple with capacity for 300 liters/day.

Project - how to start Confectionery with capacity for 500 Kg/day.