Ready project Confectionery with capacity for 500 Kg/day.

CODE - TRG-116

Ready project Confectionery with capacity for 500 Kg/day.

CODE - TRG-116


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cold Chamber
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Confectionery

How to start Confectionery with capacity for 500 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Confectionery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Confectionery Interior Design Models | Confectionery Facade Model | Pastry Shop Tips for Setting Up | Platas Confectionery | Financing Confectionery | Business Plan for a Sweet Shop | How to Get Financing from BNDES for a Pharmacy | Confectionery Facade Models | Interior Design Projects Confectionery | How to Set Up a Bakery in a Countryside Town | Tips on How to Set Up a Bakery | Interior Design Models for Bakeries | Tips for Confectionery Facades | Tips for Setting Up a Bakery | Tips for Setting Up a Bakery and Confectionery Shop | Tips on How to Set Up a Bakery | Tips on How to Open a Bakery | How to Create a Plan for a Bakery | Pastry Shop Interior Layout | Models of facades of sweet shops | Interior Layout Service Provider Business Plan | Confectionery - Interior Design | Confectionery Interiors | Confectionery Ideas | Open a Bakery | Bakery Facade Model | Tips for Confectionery Facades | Machine Tips for Setting Up a Bakery | Investments to Open a Bakery | Interior Design of Sweet Shops | Tips on How to Set Up a Bakery | Tips for Opening a Bakery | Bakery Decoration Design Tips | Confectionery Plants | Building a Bakery | Torteria Floor Plan | Flowchart for Confectionery | Tips for Setting Up a Bakery | Confectionery Business Plan Template | *business plan for a confectionery shop* | Equipment and facades of confectioneries | Setting Up a Bakery Facade | Ready-made Pastry Business Plan | Make a Plan for a Sweet Shop Online | How Much Does It Cost to Slaughter Poultry in China | Setting Up a Cosmetics Industry | Floor Plan of Sheep Farming Facilities | Setting Up Feed Store | Windshield Replacement Workshop | Selling Chicken for Roasting | See Fishmonger Equipment | Bathroom Box Assembly | Teenage Clothing Store Design In 3d | Organizational Chart of a Drug Distributor | Fish Distributor Business | Build School Floor Plan | How to Set Up a Small Cattle Slaughterhouse | Where to Buy Ready-Made Snacks | Pig Farming Business Plan | Maternity Wards Under Construction | Technical Project for Healthcare Services | Ps Children's Flowchart | Floor Plan Layout of Your Gym's Weight Room | Model of a Hotel Floor Plan | Business Plan Restaurants Food By Kilo | How to Set Up a Nightclub for 200 People | Build a Car Wash | Buffet Flowchart | Physiological Serum Business Plan | Opening a Jackhammer | Business Plan Template for Clothing Industry | Business Description Leather Glove Manufacturing | Plant for Mini Dairy | The Making of a Magnifying Glass | Work on a Toy Assembly Factory | Body Model | How to Open a Cement Artifacts Factory | How to Open - Set Up a Kite Factory | Physical Financial Schedule for Aluminum Metalworking | Small Machining Company Management | Main Equipment for Prosthetics Laboratory | Long Life Milk Production Project | Restaurant Good Manufacturing Practices Manual Template | Equipment for Setting Up a Hot Dog Shop | Standard Operating Procedure Sales Area | Veterinary Standard Operating Procedure | Floor Plan Photo Studio | Manicure Service Provision Contract Template | Organizational Chart of a Travel Agency | Accounting Office Layout | Fire Ready Project | P2f Account Plan for Pig Farming | Production Planning in Confectionery | Natural Snack Models | Shredded Coconut Factory | Grain Storage Project Floor Plan | How to Set Up a Dried Tomato Industry | Bone Scrap Leather |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
Project Industry Mineral Water Bottling with capacity for 40.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
PDF Educational and Psycho-Social Establishment Service (APAE), with an area of 1.200 m².
Plant and layout Laboratory to Produce Parental Controls with capacity for 5.000 Kg/day.
Project Factory to Produce Soy Milk with capacity for 5.000 liters per day.
Project Factory to Produce Ready Seasoning with capacity for 3.000 Kg per day.
FeasibilitySlaughterhouse Wild Boar with capacity for 10 animals per day.
Business plant Factory to Produce Injectable Medicine with capacity for 30.000 ampoules per day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Whey Cheese, with capacity of 3000 liters/day.
How to start Factory to Produce Soymilk Yogurt with capacity for 1.000 liters per day.

Project - how to start Confectionery with capacity for 500 Kg/day.