Ready project Rendering with capacity for 200 tons/day.

CODE - FRIG-207

Ready project Rendering with capacity for 200 tons/day.

CODE - FRIG-207


Project ready with:


Industry with the following sections:

Reception Room for Bones
Digesters
Tallow Production
Boiler
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Rendering

How to start Rendering with capacity for 200 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Rendering

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Citronella Oil Extraction Equipment | Ready Made Musical Instruments Business Plan | How to Assemble an Oil Change Center | Tobacco Shop Project | Snack Bar Business Plan | Utility Store Model | Clothing Rental Store Design | Fruit Industry Layout | Beverage Distributor Pricing Sheet Template | Asphalt Production Using Tires | How to Set Up a Technical School | Butcher Shop Layout | Machines for Refrigeration | How to Set Up a Medication Room | Make a Plan for an X-ray Clinic | Financing for Opening a Dental Clinic | How to Set Up a Motel | Cinema Room Budget | How to Structure a Camping Area | Fuel Station Model With Capacity For 4 Pumps | Feasibility of a Nursing Home | Financing to Set Up a Beauty Clinic | How to Make Gauze | Candle Factory Production Layout | Jeans Factory Business Plan | Cost to Make a Pair of Underwear | Material for Assembling Slippers | Picture Frame Factories | Toothpick Production Model | Model Airplane Factory Is A Good Business | Precast Slab Factory | Wall Clock Design | How to Set Up an Ecological Brick Factory | Organometallic Companies | Loan to Set Up a Clinical Analysis Laboratory | Yogurt Factory Floor Plan | 46h | Name for Motorcycle Workshop | Set up Mini Golf | Standard Operating Procedure Model Related Product | Vaquejada Park in Santa Catarina | What It Takes to Have a Sewing Studio | Model of a Reforestation Company | How to Build a Theodolite at Home | Bicycle Workshop Equipment | Asphalt Blanket in Poços De Cal | Fertilizer Industry Plant | Concrete Tile Machines | Cake Factory Equipment | Mini Coffee Roasting Machines | Seasoning Manufacturing Project Model | Pre-cooked cassava | Ready-Made Veterinary Business Plan |

 

Other projects ready:

How to start Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 5.000 liters/day.
Project Factory to Produce Macaroni Rice with capacity for 1.000 Kg/day.
PDF Cold Storage Room to Produce Mollusks (Oysters, Mussels) and Seafoods with capacity for 3.000 Kg/day.
Plant and layout Industry to Produce Toothpaste with capacity for 100 Kg/day.
Project Factory to Produce Corn Flour with capacity for 8.000 Kg per day.
Project Slaughterhouse Swines Slaughter and Cold Meat Production (Sausages, Hams, Cold Meat and Smoked Products) with capacity to Slaughter 600 animals/day.
FeasibilityFactory to Produce Garlic Paste with capacity for 3.000 Kg per day.
Business plant Cachaça (Liquor) and Brandy Bi-Distillary, with capacity of production for 1.000 liters/day.
Project Clothing Industry to Produce T-Shirts with capacity for 300 garments/day.
How to start Factory to Produce Fresh Dough for Pizza, setting up for Pizza (Filled and Frozen) and Dough for Pastry with capacity for 1.000 Kg/day.

Project - how to start Rendering with capacity for 200 tons/day.