Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Shed to Cut Glass with capacity to Produce 100 m2/day.
CODE - PRS-002
Ready project Shed to Cut Glass with capacity to Produce 100 m2/day.
CODE - PRS-002
Project ready with:
Industry with the following sections:
Reception of Glasses
Storage of Raw Material
Cutting Room
Room for Leftovers
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Shed to Cut Glass
OPTIONAL SERVICES:
Financial Feasibility Study of Shed to Cut Glass with capacity to Produce 100 m2/day.
Business plan for Shed to Cut Glass with capacity to Produce 100 m2/day.
3D project of Shed to Cut Glass with capacity to Produce 100 m2/day.
Projects with other capacities
Shed to Cut Glass
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Shed Assembly
|
Projects With Warehouse Plans
|
Warehouse Plan
|
Plan to Build a Shed
|
Pollen Processing Room
|
Covered Shed Confinement
|
I Want to Open a Company to Manufacture Bleach
|
Project to Open Auto Parts
|
How to Develop an Extreme Sports Project
|
Bank Branch Layout
|
Candy Shop Plant
|
Project to Set Up an Orthopedic Supply Store
|
Peanut candy making
|
Pharmacy Business Plan Template
|
Music School Business Ideas
|
Refrigeration Industry Prices Machinery Slaughterhouse Chickens
|
Business Plan And Meat House
|
Olympic Stadium With Capacity For
|
What Are the Two Main Customers When Starting a Business?
|
Floor Plan of a Physiotherapy Clinic
|
Bndes Party Hall
|
Ready-Made Bar Kits
|
Set Up Ballet Academy
|
Cost to Set Up a Bowling Alley
|
Car Wash Plant Models
|
Hotel Floor Plan for Senior Citizens
|
What Is Required To Open An Acid Analysis Laboratory?
|
Physical Science In Construction Fireworks
|
How to Start a Disposables Business
|
Business in Disposable Cups
|
Plastic Recycling Project Model
|
Wood Autoclaves
|
How to Manage a Precast Factory
|
Electrical Memorial of the Ice Cream Industry
|
Making Paper Cupcake Wrappers
|
Beam Mounting Bracket
|
Uht Milk Equipment Manufacturer
|
Automotive Service Business Plan
|
Cosmetic Standard Operating Procedures
|
Work Plan Procedure
|
How to Set Up a Bus Company
|
Call Center Construction Schedule Example
|
How to Set Up a Document Laminating Store
|
How to Set Up a School Driving Company
|
Physical Arrangement of Fruit Pulp Factory
|
How Pastel Dough Production Works
|
Sand Port Study
|
French Fries Business Plan
|
Equipment for Guarana Production
|
Peanut Oil Processing
|
Cemetery Financing
|
Other projects ready:
How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Whey Cheese, Butter, with capacity of 6000 liters/day.
Project Farm to Produce and Slaughter Country Chicken (Frango Caipira) with: Farm and Slaughterhouse, and capacity for 5.000 Chickens per day.
PDF Sterilization Unit (by Ethylene Oxide) with capacity for 50.000 Units per day.
Plant and layout Milk and Dairy Industry for Fresh Cheeses (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Yogurt, milk Beverages, with capacity of 3000 liters/day.
Project Slaughterhouse for Bovines and Swines - 150 animals/day - area of 1.200 m² (1.435,2 sq.yd).
Project Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 50 garments/day.
FeasibilityCachaça (Liquor) Factory, with capacity for 2.000 liters/day and built area of 700 m².
Business plant Hospital Waste Incinerator with capacity for 3.000 Kg/day.
Project Clothing Industry to Produce Jeans Pants with capacity for 200 garments/day.
How to start Factory to Produce Chalk with capacity for 5.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US