Ready project Slaughterhouse Bovines and Swines with capacity to Slaughter 300 animals/day.

CODE - FRBS-019

Ready project Slaughterhouse Bovines and Swines with capacity to Slaughter 300 animals/day.

CODE - FRBS-019


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Bovines
Stunning area for Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Reception Room for Bristles and Hoof
Craws and Guts
Small Guts Section
Cold Chamber for Small Guts
Small Guts Packaging
Expedition of Small Guts and Guts
Deboning Room
Storage for Packages
Packing Room
Control and Expedition
Cold Chamber for Finished Products
Expedition of Carcass and Finished Products
Expedition Platform
Lower Floor:
Rendering Reception Section
Leather Reception Section
Horn and Mocotó Reception Section
Rendering:
Bone Section
Blood Drying Section
Leather:
Salt Storage
Leather
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Bovines and Swines

How to start Slaughterhouse Bovines and Swines with capacity to Slaughter 300 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Bovines and Swines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Refrigerator Plant Design | Cattle Slaughter Development | Refrigerator Layout | Equipment for Making Shampoo and Soaps | How to Assemble an Auto Parts Store | Container Project Dwg Model | Set Up Car Shop | Candy StoresFacades | Facade Model for Jewelry Store | Peanut Candy Manufacturers How To Buy | Pharmacy Budget Template | What You Need to Open a Music School | Chicken Cold Storage Flowchart | Casa De Carnes Business Plan | Football Stadium Plans5d | Floor Plan of Surgical Center | Autoclaving of Hospital Waste | Party Hall Model Floor Plan | What Do I Need to Set Up a Bar Restaurant? | How to Put Together a Dance Lesson Plan | How Much Does It Cost To Set Up 3 Bowling Lanes | Environmental Law for Lava Jato Mg | What Equipment Do I Need for an A La Carte Restaurant? | Cost of Setting Up a Microbiology Laboratory | Cost of Setting Up a Gift Factory | Suit Store Floor Plan | Articles About Layout for Assembling Clothing | How to Set Up Disposable Cup Production | Recycling Plant Floor Plan Layout | Educational Toys MDF | Concrete Block Factory Plant | Packaging Sector Factory Flowchart | Set Up A Plate Factory In Mg | Dairy Project Consulting | Setting Up a Water Distributor Initial Cost | How to Set Up a Battery Factory | Pop For Cosmetics | Pop For Laboratory | How to Open a Bus Company | Setting Up a Billboard Business | We Make Small Editions of Books | Template How to Set Up a Coffee-break Project for a Company | The Ice Cream Shop Project | How to Make Fresh Pasta | Cashew Wine Production | How to Make Frozen Pre-Fried Potatoes | Cocoa Processing Industry | How to Set Up an Essential Oil Distillery | How to Set Up a Dog Cemetery |

 

Other projects ready:

How to start Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 15.000 liters/day.
Project Factory to Produce Cocada (coconut candy) with capacity for 10.000 Kg/day.
PDF Tanning Ovine Skin with capacity to Produce 2.000 skins per day.
Plant and layout Auditorium and Convention Center with capacity for 2.000 people.
Project Factory to Produce Dough of Frozen Cheese Bread with capacity for 15.000 Kg/day.
Project Factory to Produce Chocolate Powder with capacity for 10.000 Kg/day.
FeasibilityFactory to Produce Banana Flour (Banana in Powder) with capacity for 3.000 Kg per day.
Business plant Factory to Produce Crystallized Candies with capacity for 500 kg/day.
Project Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 100 liters/day.
How to start Factory to Produce Premolded Rock Soil with capacity for 500 m2/day.

Project - how to start Slaughterhouse Bovines and Swines with capacity to Slaughter 300 animals/day.