Ready project Slaughterhouse Bovines and Swines with capacity to Slaughter 400 animals/day.

CODE - FRBS-020

Ready project Slaughterhouse Bovines and Swines with capacity to Slaughter 400 animals/day.

CODE - FRBS-020


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Bovines
Stunning area for Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Reception Room for Bristles and Hoof
Craws and Guts
Small Guts Section
Cold Chamber for Small Guts
Small Guts Packaging
Expedition of Small Guts and Guts
Deboning Room
Storage for Packages
Packing Room
Control and Expedition
Cold Chamber for Finished Products
Expedition of Carcass and Finished Products
Expedition Platform
Lower Floor:
Rendering Reception Section
Leather Reception Section
Horn and Mocotó Reception Section
Rendering:
Bone Section
Blood Drying Section
Leather:
Salt Storage
Leather
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Bovines and Swines

How to start Slaughterhouse Bovines and Swines with capacity to Slaughter 400 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Bovines and Swines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Academic Project on Pig Farming | Schematic Section Of A Garage.dwg | Swine Flowchart | Opening a Pork Meat Processing Company | Cattle Flowchart | Refrigerators Flowchart | Soap Industry Layout | Musical Instrument Financing | How to Set Up an Oil Change Company | Tobacco Shop Project Template | I want to make pies to sell | Name Ideas for Home Goods Stores | Costume Rental Business Plan | List of Industrial Equipment for Gelatin Production | Drink Disk Assembly | What is the Financial Viability of Investing in a Tire Recycling Plant? | Materials for Assembling a Nursing Technician Course | Butcher Shop Layout Templates | Attached Rooms in the Goat Slaughterhouse | Flowchart of a Corporate Outpatient Clinic Service | How to Set Up an X-Ray Clinic | Clinic Layout Plan | Hotel Project Models In Dwg | Project Of Cinema Dwg | Camping Project Model | Ceee Poa Standard Projects Gas Stations | Male Aesthetic Clinic Organization Chart | Gauze Compress Making Machine | Toilet Paper Machine Project Example | Clothing Company Layout Plant Templates | Underwear Factory Business Plan | Havaianas Style Flip Flops | Dvd And Cd Factory Project Template | How the Popsicle Stick Factory Works | Ready Projects in Avões | Machines for Precast Slab Industry | How to Open a Wall Clock | Recycled Brick Industries | Mount a Galvanization | Clinical Analysis Laboratory Flowchart | What Machinery Do I Need to Set Up a Yogurt Factory? | Setting Up an Industrial Laundry | Motorcycle Workshop Projects | Fair Stall Models Cad | Project Pop | Rodeo Track Layout | Sewing Project | Eucalyptus Business Plan | Real Estate Layout#pq=Floor Plan Real Estate Office | Bicycle Office Models | Open a Swimming Pool Company | Chicken Feed Production Flowchart | Cement Tile Manufacturing Additive | What Do I Need to Set Up a Cake Factory? | Provision of Coffee Grounding Services | Spice Factory Flowchart | Veterinary Clinic Project In 3D |

 

Other projects ready:

How to start Factory to Produce Freeze-Drying Food with capacity for 1.000 Kg/day.
Project Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
PDF Factory to Produce Cone for Ice Cream with capacity for 3.000 kg/day.
Plant and layout Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 500 Kg/day.
Project Factory to put Cachaça (Liquor) in bottles, with capacity for 5.000 liters/day.
Project Clothing Industry to Produce Heavy Fabrics (Canvas) with capacity for 100 garments/day.
FeasibilityMilk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 20.000 liters/day.
Business plant Factory Casting of Cinereous Iron with capacity for 500 Kg/day.
Project Factory to Produce Synthetic Marble with Plastic Resin with capacity for 1.000 pieces per day.
How to start Factory to Produce Wood Briquette with capacity for 5.000 Kg/day.

Project - how to start Slaughterhouse Bovines and Swines with capacity to Slaughter 400 animals/day.