Ready project Slaughterhouse Bovines with capacity to Slaughter 300 animals/day.

CODE - FRB-019

Ready project Slaughterhouse Bovines with capacity to Slaughter 300 animals/day.

CODE - FRB-019


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Bovines
Stunning area for Swines - Available Expansion Area
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Section
Cold Chamber for Small Guts
Small Guts Packaging
Expedition of Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather Reception Section
Horn and Mocotó Reception Section
Rendering:
Bone Section
Blood Drying Section
Leather
Salt Storage
Leather
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Bovines

How to start Slaughterhouse Bovines with capacity to Slaughter 300 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Bovines

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Steps to Open a Refrigerator | Candy Store Project Templates | Toothpaste Raw Material Suppliers | Hydraulic Store Relationship | Viability of Cosmetics Stores | Fuel Station Assembly Budget | Juice Bar Assembly | I want to set up a 12c99 product store | Haberdashery Suppliers | Feasibility Project for Paçoca Production | How to Set Up a Wine Cellar Beverage Distributor | How to Set Up an Oil Recycling Company | Dance Room Model | Fish Processing Machinery | How Much Does a Soccer Field Cost? | Necessary to Open Radiology Clinic | Financing Dentist Office | Opening a Storage Company | How to Set Up a Movie Theater | Spa Plans and Projects | Pizzeria Business Model | How to Set Up and Manage a Nursing Home | Nursing Home How to Open | How Physiological Serum Is Manufactured | Examples of Marble Projects | Launch of an Essential Oil Distillery | Set Up Bikini Factory | How to Set Up a Shoe Factory Lau Out | Fiberglass Projects | Coal Plant Flow Chart | Machines for Mobile Sawmills | Block Factory Feasibility | How Can I Set Up a Barbecue Grill with an Oven and Wood Stove? | How to Start a Mosaic Business | Electronic Brewery Project | Layout of a Quality Control Laboratory | Dairy Beverage Flowchart | How to Create a Hospital Organizational Chart | Bodywork and Painting Workshop Project | Model For Building Mine Skate Ramp | Pop Pharmacy Cleaning | How to Set Up a Hygiene and Cleaning Products Company | Podiatry Salon Floor Plan | How to Open a Virtual Employment Agency | How to Develop a Telesales Project | Company That Installs Sound In Vehicle For Advertising | Patenting a Telemessage | Palletized Pet Food | Ceramic Brick Manufacturing Flowchart | Plan to Set Up Bakery | Snack Factory Organization Chart | Good Manufacturing Practices in Hearts of Palm | Sweets Financial Plan | To Open a Pharmaceutical Industry |

 

Other projects ready:

How to start Slaughterhouse Bovines, Swines, Caprines, Ovines, Equines and Ostrich with capacity for 30 animals per day.
Project Factory to Produce Chewable Candies and Candy bars with capacity for 1.000 Kg/day.
PDF Factory for Garlic Paste production with capacity of 5.000 kg/day and 300m² (358,8 sq.yd.) area.
Plant and layout Factory for processing of Tomato Extract with 500 m² (598 sq.yd.) area and capacity of 7.500 kg of fruits/day.
Project Factory to Produce Garapa (Sugar Cane Juice), with capacity for 750 liters/day.
Project Factory Fruit Improvement with capacity for 20.000 Kg per day.
FeasibilityFactory to Produce Teas with capacity for 3.000 liters/day, Packed on Plastic Cup and PET Bottles.
Business plant Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 30.000 liters/day.
Project Clothing Industry to Produce Leather Clothes with capacity for 50 garments/day.
How to start Factory to Produce Barbecue Spit with capacity for 500 Kg/day.

Project - how to start Slaughterhouse Bovines with capacity to Slaughter 300 animals/day.