Ready project Slaughterhouse Caprines with capacity to Slaughter 600 animals/day.

CODE - FRC-014

Ready project Slaughterhouse Caprines with capacity to Slaughter 600 animals/day.

CODE - FRC-014


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Caprines
Future Stunning area for Bovines and Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small guts Section
Cold Storage for Small Guts
Small Guts Packaging
Expedition for Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather and Horn Reception Section
Rendering:
Bone Section
Blood Drying Section
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Caprines

How to start Slaughterhouse Caprines with capacity to Slaughter 600 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Caprines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Forum on How to Set Up a Milking Parlor | I Want to See Pump Workshop Building Models | How to Set Up a Medical and Hospital Products Distributor | How to Open a Deli | Rotisserie Layout | How to Set Up Seedling Sales | Project About Children's Thrift Store | Cost to Set Up a Medication Distributor | Ready-made Basic Food Basket Business Plan Worksheet | Ready-made Driving School Business Plan | Beef Cold Storage Budget | Plan to Build Pig Slaughterhouse | DWG Sports Gym | Business Plans Ready Medical Office | Functional Organization Chart of a UBS | How Does an ICU Work? | Study to Open a Buffet | Self-Service Restaurant Floor Plan | How to Set Up a Collective Kitchen | Cost of Setting Up a Dance Club | Quick Wash Pants | Children's Party House Projects | Serpentarium Floor Plan Model | Set Up Tent Factory | Women's Clothing Business Plans | Technological and Production of a Uniform Company | Set up Garbage Bag Manufacturing | Raw Material for Plastic Straws | MDF Factory | Gc3b4ndolas Bndes | Post Hardware | Gift Box Making Machines | Aluminum Window Factories Poços De Caldas | Investment to Set Up a Door Factory | What Equipment Is Needed to Set Up a Prosthetics Laboratory? | Yogurt Bag Packaging | Water Bottling Equipment | How to Conduct a Study to Set Up a Parking Lot | Example of a Company's Operational Process | Restaurant Pops | Floor Plan Design for Beauty Salon | I'm looking for a store to set up a funeral home | Documentation for Renting a Van | Factoring Business Plan | Washing Station Project Floor Plan | Recording Studio Floor Plan | Setting Up a Pig Farm | Industrial Production of Snacks | Organization Chart of a Biscuit Factory | I Want to Make Baby Food | What is needed to set up an açaí factory? | Financing of a Feed Factory by BNDES | Models for Building a Pet Shop |

 

Other projects ready:

How to start Cold Meat Production and Meat Deliverer with capacity for 1.000 Kg/day.
Project Factory to Produce Dry Tomato with capacity for 500 Kg per day.
PDF Factory to Produce Wine, with capacity for 300.000 liters/year.
Plant and layout Factory to Produce Garlic Paste with capacity for 5.000 Kg per day.
Project Factory to Produce Vinegar made from Apple with capacity for 500 liters/day.
Project Cold Storage Room to Process ALIVE Shrimps (from shrimps cultivation farms) with capacity to Produce 5.000 Kg/day.
FeasibilityClothing Industry to Produce Coarse Linen Shorts (cotton and flax) with capacity for 500 garments/day.
Business plant Milk and Dairy Industry for Sweet Milk (Fudge) production with an area of 200 m² (239,2 sq.yd.) and capacity for 10.000 liters/day.
Project Factory to Produce Grape Juice, with capacity for 1.000 liters/day.
How to start Factory to Produce Powder Egg with capacity for 100 Kg/day.

Project - how to start Slaughterhouse Caprines with capacity to Slaughter 600 animals/day.