Ready project Slaughterhouse Caprines with capacity to Slaughter 75 animals/day.

CODE - FRC-006

Ready project Slaughterhouse Caprines with capacity to Slaughter 75 animals/day.

CODE - FRC-006


Project ready with:

Industry with the following sections:
Stunning area for Caprines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Cold Chamber for Carcass
Control and Expedition
Expedition Platform
Rendering Reception Section
Reception Section for Small Guts
Reception and Treatment of Guts (1st and 2nd phases)
Pens

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Caprines

How to start Slaughterhouse Caprines with capacity to Slaughter 75 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Caprines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Refrigerator Physical Arrangement | Manufacturer Product Cleaning | Small Soap Factory | How to Open House Screws | I Want to Set Up a Lubricant Resale Store | WHAT IS NEEDED TO SELL ROAST CHICKEN | Bakery Layout In 3D | Learning to Assemble an Awning | Country Fashion Store Business Plan | Ready-Made Business Plan About Chocolate Factory | Beverage Distributor Budget | Documentation for Nursery | Sewage Treatment Plant Project DWG Dwg | Pork Pururuca Industry | Model Fish Refrigerator | Projection Models on Accessibility in Apaes | How to Set Up a Hospital Waste Treatment Company | Hospital Waste Project | Motel Suite Plans With Living Room | Pastry Models | Pop Hospital Marmitex Supply | Saunas How to Assemble | Plans and Projects for Snack Bars | Budget for Setting Up a Video Rental Store | Immunology Analyzer | Glass Recycling Plants in Brazil | Trousers Manufacturing Flowchart | Raffia Bag Manufacturers | Lining Production Capacity | Buy Styrofoam Brick | Making Mg Briquettes | Project to Assemble Pallet Factory | Ready Plaster Projects | Buy Notebook Factory | Layout for metalworks | Gas Cylinder Manufacturing Process | Soil Model Laboratory | Equipment for Setting Up a Milk Company | Ready-made Medication Bpf Manual | Wheelchair Accessible Bathroom Floor Plan | Pasteurized Egg Supplier In Santa Catarina | Hospital Hygiene Pop Model | What You Need to Set Up a Gas Distributor | Hydroponics Project Model | Orange Juice Machine Drawing | Collection Office Business Plan | Machinery for Sofa Reform | I want to set up a notary's office in Brochier. What do I need? | English Cake Makers | What is needed to set up a bakery? | What is needed to make palm hearts? | How to Set Up a Corn Processing Plant | Cashew Production Budget | Documents Required to Open a Dog Hotel |

 

Other projects ready:

How to start Factory to Produce Pallet Fodder for Fishes, Cats and Dogs with capacity for 500 Kg/day.
Project Factory to Produce Expanded Clay with capacity for 5.000 Kg/day.
PDF Industrial Bakery to Produce Frozen French Bread with capacity for 5.000 Kg/day.
Plant and layout Meat Shop with an area of 500 m2.
Project Factory Galvanoplasty with capacity for 1.000 Kg/day.
Project Slaughterhouse Poultry Slaughter, Cold Meat Production, Smoked Products and Breaded Chicken with capacity to slaughter 500 birds/day.
FeasibilityFactory to Produce Pepper Powder, Dehydrated Pepper, Pepper Paste, in Natura Pepper, Capsaicin and Pepper Oleoresin with capacity for 3.000 kg/day.
Business plant Milk and Dairy Industry to Produce Ultrafiltration Fresh Cheese with capacity for 30.000 liters of Milk per day.
Project Factory to Produce Pepper Oleoresin with capacity for 100 Kg/day.
How to start Factory to Produce Fried Garlic and Grinded Garlic with capacity for 3.000 kg/day.

Project - how to start Slaughterhouse Caprines with capacity to Slaughter 75 animals/day.