Ready project Slaughterhouse Newborn Male Calves with capacity to Slaughter 20 animals/day.

CODE - FRB-033

Ready project Slaughterhouse Newborn Male Calves with capacity to Slaughter 20 animals/day.

CODE - FRB-033


Project ready with:

Industry with the following sections:
Stunning Area for Calves
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Control and Expedition
Climatized Room for Boneless Meat
Reception Room for Rendering Material
Salting Room
Packaging Room
Storage for Packages
Storage for Salt
Storage for Finished Products
Shipyards for Charque Processing
Expedition Platform
Reception Section for Rendering
Reception Section for Small Guts
Reception and Treatment Section for Guts (1ª and 2ª phases)
Pens

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Newborn Male Calves

How to start Slaughterhouse Newborn Male Calves with capacity to Slaughter 20 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Newborn Male Calves

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Where to Buy Newborn Calves | Cold Storage and Sale of Calves | Reception Physical Plan | Born Beef Slaughterhouse | Calf Cold Storage2c Purchase of Calves | Where to Buy Newborn Calves | Consulting for setting up a refrigerator | Refrigerator Business Plan | Shipyard Business Plan Template | I Want To See A Lot Of Newborn Calves | Slaughtering calves | Refrigerator Purchase Budget | Newborn Male Calves | Reception Physical Plan | Refrigerator Consulting Model | Newborn Photo Montage | Physical Layout of a Refrigerator | Farms That Pack Quail Eggs | What Do I Need to Open a Homemade Chocolate Business? | Soap Factory Layout | Music and Musical Instruments Layout | How to Set Up an Oil Change Shop | What to Do to Open a Tobacco Shop | Pie Sale | Home Goods Store Template | How to Set Up a Clothing Repair and Alteration Shop | Gelatin Production And Flowchart | Setting Up A Beverage Storage Facility | Tire Recycling Support Bnds | Technical Course Business Plan Template | Assembly for Butcher Shop | How to Build a Swine and Beef Slaughterhouse | Layout of a Medical Clinic | How to Set Up a Radiology Clinic | Dental Clinic Projects | Cinema Project Floor Plan | Setting Up a Campsite | How to Manage Your Gas Station Well | How to Install a Brewery | Plant A Baixa De Estetica Clinic | Pa Gauze Machines | Industries Small Paper Factories Starting Manufacturing Hygienic Towel Sc | Floor Plan of a Clothing Company | Underwear Factory Project | How to Set Up a Flip-Flop Factory | How to Set Up a Pencil Case Factory | Plastic Toothpick Manufacturer | Miniature Airplane Projects | Machines for manufacturing precast slabs | How to Mount a Protective Screen | Layout of Ecological Bricks Company | Main Organometallic Suppliers | Clinical Analysis Laboratory Flowchart | Open Butter Factory | Business Plan for Industrial Laundry | Mechanical Workshop Construction | City with 10,000 inhabitants | Pop Cleaning of Facilities | Vaquejada Park Plan | Senai Sewing Workshop Project | Sample Cooperative Business Plan | Set Up a Real Estate Office | Bike Office Mount | Feed Depot Business | Capacity to Produce Concrete Tiles | Cake Factory Business Plan | Coffee Roasting Project In Ppt | Seasoning Industries - Legislation | Pre-cooked cassava | Equipment Design for a Veterinary Clinic |

 

Other projects ready:

How to start Rice Mill to Produce Rice Starch with capacity for 5.000 Kg/day.
Project Factory to Produce Seasoning and Condiments with capacity for 5.000 Kg/day.
PDF Sterilization Unit (by Low Temperature Steam and Formaldehyde) with capacity for 3.000 Units per day.
Plant and layout Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with White Mould (Camembert, Brie), with capacity of 5000 liters/day.
Project Factory to Produce Chalk with capacity for 5.000 Kg/day.
Project Factory Aluminum Casting with capacity for 1.000 Kg/day.
FeasibilityClothing Industry to Produce Caps with capacity for 300 garments/day.
Business plant Childcare with capacity for 10 Children's.
Project Factory to put Cachaça (Liquor) in bottles, with capacity for 10.000 liters/day.
How to start Slaughterhouse Bovines and Swines and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) and Charque Processing with capacity to Produce 700 animals/day.

Project - how to start Slaughterhouse Newborn Male Calves with capacity to Slaughter 20 animals/day.