Ready project Tanning Ovine Skin with capacity to Produce 1.000 skins per day.

CODE - CTM-035

Ready project Tanning Ovine Skin with capacity to Produce 1.000 skins per day.

CODE - CTM-035


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ovine Skin

How to start Tanning Ovine Skin with capacity to Produce 1.000 skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ovine Skin

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tannery Construction | Sheep Skin Tanning in Brazil | Sheep Tanning Equipment | Timeline of a Tannery | Tannery Production Flow | Building a Tannery | Sheep Skin Tannery | Sheep Tannery | Why Marble Sheep Skins | .sheepskins | Tanning Installation Schedule | How to Make a Sheep Farming Project | Sheepskin Leather Tannery | Sheep Production Schedule and Budget | Tannery Machinery Production | Academic Projects Sheep | Tanning Machines For Sale | Names of tanning machines | Sheep Skin Tannery | Sheep Farming Tannery Flowchart | Tannery Equipment | Tannery Production Flowchart | How to Develop a Sheep Farming Project | Sheep Skin Tannery | Sample Tannery Timeline | Sheep Tannery | Sheep Tanning | Sheep Leather Equipment | How to Make a Sheep Project | Build Tannery | Sheep Tannery Machinery | Sheep Farming Project Plans | Sheep Leather Tanning Equipment | Sheep Skin Tanning | How to Make a Sheep Project | Sheep Tannery | Sheep Tannery | Production Schedule of a Tannery | Sheep Skins Brazil | Micro Tannery Project | Tannery Drawing | Machines Used in Tannery | Tannery Construction | Sheep Skins in Brazil | Products Used in Sheep Tanning | Sheep Skins Tannery | Tannery Model | Tanneries - How to Build | Tanning Equipment For Sheep Skins | Tannery Planning | Poultry Shed Constructions | Deodorant Manufacturing | Computer Store Floor Plan | How to Start a Security Equipment Company | Finame Bndes Gas Station | Juice Bar Ideas | Disposable Product Lists for a Store | Computerized Recording | Candy Factory Floor Plan | How a Beverage Distribution Center Works | Scrap Structure | Computer School Room Plans | Setting Up A Poultry Slaughterhouse | Project to Make a Society Field | Ready Project in the Area of Preventive Dentistry | Plan to Build a Dental Office | Industrial Kitchen Business Plan | Top Suppliers of an Urban Spa | Project to Open a Beer Disk | What You Need to Set Up a Nursing Home | How to Open a Massage Parlor | Serum Manufacturers In Brazil | What Machines Do I Need to Set Up a Marble Factory? | Raw Material for T-Shirt Printing | Curtain Production Flowchart | Slipper Strap Manufacturer | Swimming Pool Fabrication | How to Set Up a Barbecue Industry | How to Open a Shopping Center | Brick Factory Models | Set up a Fireplace Factory | How to assemble a P2f Brick Machine | Civil Construction Plant Model | Pathology Laboratory Equipment Price | How to Set Up a Yogurt Factory | Commercial Project Floor Plan Clothing Store | Investment in Motorcycle Workshop | Skate Rink Plans for Street | Pops For A Pharmacy | Ppho In Restaurants | How to Set Up a Tailor Shop | Private Serenity How to Set Up | Glp.gwg | Weights for assembling Disofa factory | How to Start a Radio Taxi Business | Micro Fertilizer Industry | Hollow Brick Model | Mounting Bread Factory | Concentrated Orange Juice Flowchart | Exhaust Production Factory | Granola Processing | Equipment for preparing ointments |

 

Other projects ready:

How to start Factory to Produce Canned Vegetables (Canned Corn, Canned Pea, Canned Potato, Canned Carrot, Selection of Canned Vegetables) with capacity for 15.000 Kg per day.
Project Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 5.000 liters/day.
PDF Clinical Pathology Laboratory, with an area of 300 m².
Plant and layout Factory Improvement of Coconut Water (Normal Pasteurization) with capacity for 10.000 liters/day.
Project Peanut Candy Factory (Pé-de-Moleque, Paçoca,CrocCandy, Gibi), with capacity of 3000 kg/day and 500 m² (598 sq.yd.).
Project Industry of Ice Production in cubes with capacity for 10.000 Kg/day.
FeasibilityFactory to Produce Fish Flour and Fish Oil with capacity for 1.000 Kg/day.
Business plant Factory to Produce Mead, Vinegar made from Honey, Cachaça of Honey and White Wine (Prosecco) of Honey with capacity for 500 liters/day.
Project Factory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 10.000 bandages per day.
How to start Improvement Unit of Seeds used to Feed Livestock with capacity for 3.000 Kg/day.

Project - how to start Tanning Ovine Skin with capacity to Produce 1.000 skins per day.