Ready project Slaughterhouse Ostrich Slaughter with capacity for 5 animals/day.

CODE - FRA-001

Ready project Slaughterhouse Ostrich Slaughter with capacity for 5 animals/day.

CODE - FRA-001


Project ready with:

Industry with the following sections:
Stunning area for Ostriches
Evisceration
Inspection Department
Cold Storage for Carcass
Carcass Expedition
Room for Plumes
Room for Leather
Cold Storage for Leather
Craws and Guts
Cold Storage for Small Guts
Room of Boneless Meat
Room for Bones
Freezing Tunnel
Cold Chamber for Meat
Expedition
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Ostrich Slaughter

How to start Slaughterhouse Ostrich Slaughter with capacity for 5 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Ostrich Slaughter

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Hair Dye Suppliers | Hardware Store Floor Plan | Floor Plan and Perfumeery Layout | Construction Diagram of a Gas Station | Garden Shop Construction Projects | Surf Shop for Sale | Business Plan Factory Project | How Many M2 Do I Need to Set Up a Compounding Pharmacy? | Recycled Rubber Manufacturer | Setting Up a Day Care | Fish Holding Chamber | Socyte Football Field Projects | Radiology Clinic Floor Plan Template | Dental Office Dwg | Restaurant Business Plan | Lottery House Business Plan | Small Pizzeria Projects | Elderly Home Floor Plan | Aromatherapy Business | Model of a Pharmaceutical Industry Plant | Starting a Marble Shop | Biscuit Manufacturing Business Plan | Bikini Making Machine | Floor Plan of a Footwear Factory | Cell Phone Cover Factory Store | Charcoal | Carpentry How to Make Beds | Concrete Block Factory Project | Clay Oven In Dwg | Machines to Manufacture Ceramic Floors | Nursery Manufacturing | List of Materials Needed for Food Laboratory | Dairy Industry Organizational Chart Template | How to Set Up a Jeans Laundry | Online Quote for Car Bodywork | Build a Wooden Skate Park | Veterinary Pharmacy Pop | Ppho Model | Podiatry Rooms | Floor Plan for Travel Agency | Construction Company Viability | How to Set Up a Workshop for Technical Assistance in Domestic Appliances | Setting Up a Cleaning Company | Layout of Feed Factory Equipment | Layout of a Ceramic Company | Bndes Financing for Small Bakery Companies | Snack Factories | Growing Champignon Mushrooms With Ready-Made Compost | Bananas Ready Project Example | How to Set Up a Pharmaceutical Industry Steps |

 

Other projects ready:

How to start Cold Storage Room to Produce Salted and Dried Fishes and Fish Products with capacity for 1.000 Kg/day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 5 Blocks per Week.
PDF Pastry Shop with an area of 100 m2.
Plant and layout Factory to Produce Vinegar made from Apple with capacity for 100 liters/day.
Project Factory for Popcorn Processing (Micro-Wbird package) with 400m² (478,4 sq.yd.) area and capacity of 3.000 kg/day.
Project Hospital Laundry with an area of 400 m² and services for 200 beds.
FeasibilityCachaça (Liquor) Factory, with capacity for 15.000 liters/day. (To be built in a flat land).
Business plant Factory to Produce Injectable Medicine with capacity for 20.000 ampoules per day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with White Mould (Camembert, Brie), with capacity of 8000 liters/day.
How to start Hostel with capacity for 300 Alojamentos.

Project - how to start Slaughterhouse Ostrich Slaughter with capacity for 5 animals/day.