Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Slaughterhouse Ovines with capacity to slaughter 75 animals/day.
CODE - FRC-036
Ready project Slaughterhouse Ovines with capacity to slaughter 75 animals/day.
CODE - FRC-036
Project ready with:
Industry with the following sections:
Stunning area for Ovines
Evisceration
Inspection Department
Antechamber
Cold Chamber for Carcass
Control and Expedition
Expedition Platform
Rendering Reception Section
Reception area for Small guts
Reception and Treatment area for Guts (1st and 2nd phases)
Pens
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Slaughterhouse Ovines
OPTIONAL SERVICES:
Financial Feasibility Study of Slaughterhouse Ovines with capacity to slaughter 75 animals/day.
Business plan for Slaughterhouse Ovines with capacity to slaughter 75 animals/day.
3D project of Slaughterhouse Ovines with capacity to slaughter 75 animals/day.
Projects with other capacities
Slaughterhouse Ovines
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
.frigurifico for sheep slaughter .br
|
Set Up a Cleaning Products Factory
|
Selling Detergent Factory
|
Screw Shop Assembly
|
Oil Change Plan Template
|
Roast Chicken E2cpreendimento
|
Standard Bakery Project
|
Open a Glass Shop
|
Special Size Women's Clothing Store Design
|
Molds for Making Chocolates
|
Beverage Business
|
Equipment for Nursery
|
Organic Manure Pelleting
|
Toresmo Factory And Price In Sp
|
Fish Refrigerator Floor Plan
|
Material Preparation Area
|
Investment in Hospital Waste Incinerator Project
|
How to Set Up a Vaccination Room to Sell
|
Project to Set Up a Motel Motel
|
How to Set Up a Pastry Shop
|
Industrial Restaurant Marmitex
|
Dry Sauna Construction Companies
|
Samba School Project Template
|
List of Equipment for Hospital Laboratory Design for Analysis of Biochemistry, Hormones, Bacteriology, Micrology, Hematology, Immunology and Parasitology.
|
Outline of a Recycling Industry
|
Lingerie Production Cost
|
Sacks.dwg
|
PVC Linings Price In Poços De Caldas
|
Styrofoam Board From Factory
|
Briquette Factory Financing
|
Pallet Production Process
|
What You Need to Open a Slab Factory
|
Egg Carton Factory
|
Project for the Assembly of a Metalworking Shop
|
Green Factory Companies
|
Soil Laboratory Equipment Price
|
Budget for Yogurt and Cheese Manufacturing
|
GMP Refrigerators
|
Boat Repair Career
|
Food Smoker Models
|
What is Pop27s Hospital Hygiene?
|
Gas Project Dwg
|
Warehouse Layout In Cad
|
Project Layout Monitoring
|
Law Office Facade Design
|
Set Up Movie Store
|
Xerox Photocopy Production Flowchart
|
Pig Fattening Shed
|
Flowchart for Bread Industry
|
Pancake Shop Models
|
Mayonnaise Industry Legislation
|
Corn Production Flowchart
|
Powder Juice Process Flowchart
|
Kennel Plans for Hotel
|
Other projects ready:
How to start Factory to Produce Furniture with an area of 3.000 m2.
Project Slaughterhouse Bovines and Swines with capacity to Slaughter 600 animals/day.
PDF Factory to Produce Injected Plastic with capacity for 10.000 Kg/day.
Plant and layout Childcare with capacity for 30 Children's.
Project Slaughterhouse Industrialization and Slaughtering of Bovines and Swines with capacity for 20 Bovines and 30 Swines per day with a Built area of 468 m².
Project Slaughterhouse Bovines, Swines, Caprines, Ovines, Equines and Ostrich with capacity for 30 animals per day.
FeasibilityRestaurant 500 meals per day.
Business plant Tannery for Wet Blue until Finishing Plant, with capacity for 500 leathers/day.
Project Factory to Produce Jelly Fruit with capacity for 500 Kg/day.
How to start Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 50 garments/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US