Ready project Slaughterhouse Ovines with capacity to slaughter 75 animals/day.

CODE - FRC-036

Ready project Slaughterhouse Ovines with capacity to slaughter 75 animals/day.

CODE - FRC-036


Project ready with:

Industry with the following sections:
Stunning area for Ovines
Evisceration
Inspection Department
Antechamber
Cold Chamber for Carcass
Control and Expedition
Expedition Platform
Rendering Reception Section
Reception area for Small guts
Reception and Treatment area for Guts (1st and 2nd phases)
Pens

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Ovines

How to start Slaughterhouse Ovines with capacity to slaughter 75 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Ovines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

.frigurifico for sheep slaughter .br | Set Up a Cleaning Products Factory | Selling Detergent Factory | Screw Shop Assembly | Oil Change Plan Template | Roast Chicken E2cpreendimento | Standard Bakery Project | Open a Glass Shop | Special Size Women's Clothing Store Design | Molds for Making Chocolates | Beverage Business | Equipment for Nursery | Organic Manure Pelleting | Toresmo Factory And Price In Sp | Fish Refrigerator Floor Plan | Material Preparation Area | Investment in Hospital Waste Incinerator Project | How to Set Up a Vaccination Room to Sell | Project to Set Up a Motel Motel | How to Set Up a Pastry Shop | Industrial Restaurant Marmitex | Dry Sauna Construction Companies | Samba School Project Template | List of Equipment for Hospital Laboratory Design for Analysis of Biochemistry, Hormones, Bacteriology, Micrology, Hematology, Immunology and Parasitology. | Outline of a Recycling Industry | Lingerie Production Cost | Sacks.dwg | PVC Linings Price In Poços De Caldas | Styrofoam Board From Factory | Briquette Factory Financing | Pallet Production Process | What You Need to Open a Slab Factory | Egg Carton Factory | Project for the Assembly of a Metalworking Shop | Green Factory Companies | Soil Laboratory Equipment Price | Budget for Yogurt and Cheese Manufacturing | GMP Refrigerators | Boat Repair Career | Food Smoker Models | What is Pop27s Hospital Hygiene? | Gas Project Dwg | Warehouse Layout In Cad | Project Layout Monitoring | Law Office Facade Design | Set Up Movie Store | Xerox Photocopy Production Flowchart | Pig Fattening Shed | Flowchart for Bread Industry | Pancake Shop Models | Mayonnaise Industry Legislation | Corn Production Flowchart | Powder Juice Process Flowchart | Kennel Plans for Hotel |

 

Other projects ready:

How to start Laundry for Hotels with services for 500 rooms per day.
Project Factory to Produce Fodder for Sharks with capacity for 500 Kg/day.
PDF Factory to Produce Premolded Rock Soil with capacity for 5.000 m2/day.
Plant and layout Milk and Dairy Industry for Packed Milk production types B and C, with capacity of 3000 liters/day.
Project Clothing Industry to Produce Knitwear with Dyeing Sector with capacity for 100 garments/day.
Project Factory to Produce Chocolate Powder with capacity for 1.000 Kg/day.
FeasibilityFlower Shop with an area of 100 m2.
Business plant Factory to Produce Distilled from Honey, with capacity for 100 liters/day.
Project Pastry Shop with an area of 300 m2.
How to start Tannery for Wet Blue until Finishing Plant, with capacity for 50 leathers/day.

Project - how to start Slaughterhouse Ovines with capacity to slaughter 75 animals/day.