Ready project Factory Milk Powder Reconstitution with capacity for 3.000 liters/day.

CODE - LTC-096-C

Ready project Factory Milk Powder Reconstitution with capacity for 3.000 liters/day.

CODE - LTC-096-C


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Microbiological Laboratory
Production Room
Packing Room
Cold Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Milk Powder Reconstitution

How to start Factory Milk Powder Reconstitution with capacity for 3.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Milk Powder Reconstitution

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up a Dairy Business | Fabricva Milk Powder Laboratory | How to Set Up a Milk Powder Factory | Milk Company Layout | Candy Store Plant | Raw Material for Toothpaste | Computer Store Layout | Perfume Stores2fmodelos | DWG Gas Station Floor Plan | Set Up a Juice Bar | Setting Up a 199 Company | Material for Assembling a Closet | Peanut Industrial Project Example | Bnds Financing for Beverage Deposit | Deposit Equipment | Dance Studio Floor Plan | Fish Floor Plan | How Much Does It Cost to Open a Society Court? | Rules for Setting Up a Radiology Clinic | Dental Office Materials List | Industrial Restaurant Floor Plan | Cinema Montage | How Much Does It Cost to Set Up a Spa? | What is needed to set up a Pizza Disk | How to Set Up a Nursing Home for the Elderly | Nursing Home Financing Method | Saline Solution Manufacturing Cost | Layout for assembling a marble factory | How Much Citronella Do I Need To Purchase A Liter Of Oil | What do I need to make bikinis? | Shoe Production Layout | How to Set Up a Fiberglass Factory | Machine to Make Charcoal | Sale of Machines for Mobile Sawmills | Description of the Concrete Block Production Process | Wood Stove Floor Plan | Porcelain Factory How to Assemble | Machines for assembling sanitary metals | Quality Laboratory Project | Ready Yogurt Layout | Hospital Flowchart | Lampernage | Simple Skate Park Templates | Pop Cleaning in Pharmacies | Layouts for Distributors of Related Health Products | Podiatry Cabin | Layout of an Employment Agency | Sales Project Template for Telemarketing | Advertising Sound Model and Design | Layout in Service Companies | Feed Business Plan | Maromba For Sale Of Bricks | French Bread Mold Template | Price to Set Up a Corn Snack Factory | Availability of Palm Heart Production Equipment | Machine To Make Banana Puree | Pharmaceutical Factory Floor Plan |

 

Other projects ready:

How to start Factory for toasted Chestnut industrialization with production capacity of 1.000 kg/day 250m2 (299 sq.yd.) area.
Project Industry to Produce Footwear with capacity for 300 pairs/day.
PDF Milk and Dairy Industry for Yogurt production, Milky Beverages, with capacity of 3000 liters/day.
Plant and layout Factory to Produce Cachaça (Liquor) made from Manioc with capacity for 500 liters/day.
Project Nursery and Day Care with capacity for 30 children.
Project Factory to Produce Alcohol Gel with capacity for 5.000 liters/day.
FeasibilityCold Storage Room to Produce Smoked Fish and Fish Products with capacity to Produce 20.000 Kg/day.
Business plant Factory to Produce Gauze Compress and Cotton Yarn Bandage (not sterilized) with capacity for 200.000 compresses (400 packages with 500 compresses) per day.
Project Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 50 animals/day.
How to start Industry of Ice Production in cubes with capacity for 1.000 Kg/day.

Project - how to start Factory Milk Powder Reconstitution with capacity for 3.000 liters/day.