Ready project Slaughterhouse Poultry Slaughter with capacity for 30.000 birds/day.

CODE - FRF-007

Ready project Slaughterhouse Poultry Slaughter with capacity for 30.000 birds/day.

CODE - FRF-007


Project ready with:

Industry with the following sections:
Reception Platform
Reception
Stunning area
Scalding Room
Room of Pluck
Evisceration
Packaging
Cold Chamber
Expedition
Cutting Room
Box Storage
Packages Storage

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Poultry Slaughter

How to start Slaughterhouse Poultry Slaughter with capacity for 30.000 birds/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Poultry Slaughter

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Layout Of A Model Chicken Packaging | Set Up A Cleaning Material Factory | I Want to Open a Mini Soap Factory | Screw Shop Model | How to Organize Lubricant Storage | Chicken Shop Name Ideas | Bakery Area Project | Ready-made Organization Chart of a Glass Company | Floor Plan for a Small Women's Clothing Store | Chocolate Production Flowchart | Organizational Chart Drawing of a Distribution Company | Nursery Equipment | Pelletizing Budget | Ovens for Large-Scale Production of Pururuca | Fish Production Scheme | Sterilization Area | Hospital Waste Insulation Industry | How to Set Up a Vaccine Distributor | Drive Motel Project | Complete Pastry Project Example | Rule for Assembling Lunch Boxes | Sauna Floor Plan | I Want to Open a Samba School | Hematology Laboratory Layout | How to Set Up a Glass Recycling Factory | Lingerie Manufacturing | Raffia for Making Bags | Pvc Lining Project | Where to Buy Styrofoam Board for Refrigerator Construction | How to Produce Briquettes | Pallet Business Plan | Slab Factory Names | Egg Box Factory | Electrical Project of a Metalworking Shop | How to Set Up a Cold Cuts Factory | Pop Soil Lab | Budget for Machinery for the Dairy Industry | Refrigerator GMP | Boats Dwg | Smokers Project | What is Pop and How to Assemble It | Gas Distributor Project | Greenhouse Shed Dwg | Central Tracking Project | Proger Law Firm | I Want to Open a Film Application Company | Equipment for Setting Up a Copier | Pig Shed for Fattening | Cheese Bread Flowchart | Pancake Making Machines | Mayonnaise Industry and Sif | Flowchart of a Seed Processing Unit | Manufacturing and Process of Powdered Juices | Floor Plan for a Dog Boarding House |

 

Other projects ready:

How to start Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 2 Blocks per Week.
Project Beauty Salon with an area of 500 m2.
PDF Factory to Produce Ceramic Floors with capacity for 30.000 m2/day.
Plant and layout Farm Quail Breeding with capacity for 1.000 Birds per day.
Project Factory to Produce Pizza Dough, Frozen and Cooler Filled Pizza with capacity for 5.000 kg/day and area of 700 m².
Project Milk and Dairy Industry for Yogurt with 120 m2 (140 sq.yd.) area and capacity of 4.000 liters/day
FeasibilityFactory to Produce in natura Potato with capacity for 5.000 Kg per day (Potato Washer).
Business plant Factory to Produce Wax with capacity for 5.000 Kg/day.
Project Factory to Produce Popsicles with capacity for 1.000 Kg/day.
How to start Factory to Produce English Sauce and Shoyu Sauce with capacity for 5.000 liters per day.

Project - how to start Slaughterhouse Poultry Slaughter with capacity for 30.000 birds/day.