Ready project Slaughterhouse Poultry Slaughter with capacity for 5.000 birds/day.

CODE - FRF-004

Ready project Slaughterhouse Poultry Slaughter with capacity for 5.000 birds/day.

CODE - FRF-004


Project ready with:

Industry with the following sections:
Reception Platform
Reception
Stunning area
Scalding Room
Room of Pluck
Evisceration
Packaging
Cold Chamber
Expedition
Cutting Room
Box Storage
Packages Storage

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Poultry Slaughter

How to start Slaughterhouse Poultry Slaughter with capacity for 5.000 birds/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Poultry Slaughter

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Start a Chicken Business | Slaughter of 5000 birds per day | Poultry Slaughterhouse for 5000 birds/day | Lipstick Making Machine | Cosmetics Store Project | What Do I Need to Open a Car Battery Dealership? | What Materials to Buy to Set Up a Pepper Shop | How Much Does It Cost To Start A Supplement Company | Example of an Electronics Store Layout | Clothing and Accessories Store Layout | Plastic for Honey | Pharmacy Setting Legislation | How to Set Up a Company on Paper | How to Set Up a Tutoring Company | How Much Does It Cost To Set Up A Cattle Slaughterhouse | Synthetic Courts as an Investment | Opening of Radiology Clinic | Therapy Center Floor Plans | Auditorium Model | How to Set Up a Hostel | Hotel and Lodging Ebook | Pizza Label Template | Set Up a Homemade Pasta House | C3b4nico Project for Car Wash | How Much Does It Cost To Open A Fire Extinguisher Company | Straw Cigarette Industry | Beachwear Business Plan | Boot Factory Legislation | How to Open a Marble Supplies Company | How to Set Up a Styrofoam Lunchbox Factory | Bamboo Plywood | How Much Does It Cost to Open a Micro Business to Manufacture Concrete Blocks | Assemble PC Assembly | Layout Companies Industry Recycling Paper | What Do I Need to Set Up an Aluminum Packaging Factory2f | Montar Pathology Clinic | Cheese Distributor Project | How to Assemble a Body Shop | Flowchart of a Church | Pop Template for Utensil Sanitization | C2b4 Pops Templates for Hospital Pharmacy | Flowchart of a Jewelry Company | Modeling Agency Assemble | How to Open a Construction Company | Equipment for Setting Up a Screen Printing Shop | Septic Tank Installation Service | Feed Mill Plant | Build an Ice Cream Factory | Machine for Industrial Bread Production | Blueprint of a Company That Makes Soy Milk | What Do I Need to Set Up a Seasoning Factory? | What Equipment Is Necessary to Set Up a Pamonharia? | Bean Companies | Aesthetic Clinic Organization Chart |

 

Other projects ready:

How to start Laundry for Hotels with services for 100 rooms per day.
Project Factory to Produce Crystallized Candies with capacity for 1.000 kg/day.
PDF Clothing Industry to Produce Lingerie with capacity for 300 garments/day.
Plant and layout Factory to Produce Ice Cream and Fruit Pulp (Ice Cream + Pulp) with capacity for 500 Kg/day.
Project Self Service Restaurant with capacity for 300 meals per day.
Project Factory to Produce Ornamental Soaps with capacity for 100 Kg/day.
FeasibilityFactory to Produce Pickles with capacity for 3.000 Kg per day.
Business plant Factory to Produce Paper Coffee Strainer with capacity for 1.000 boxes/day.
Project Industry of Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 20 liters and 10 liters, and area of 200 m².
How to start Clothing Industry to Produce Denim Blouse with Laundry Sector (Stone Wash) with capacity for 300 garments/day.

Project - how to start Slaughterhouse Poultry Slaughter with capacity for 5.000 birds/day.