Ready project Slaughterhouse Quail with capacity for 3.000 animals per day.
CODE - FRE-011
Ready project Slaughterhouse Quail with capacity for 3.000 animals per day.
CODE - FRE-011Project ready with:
Industry with the following sections:
Reception Platform
Stunning
Scalding
Feather Withdrawn
Evisceration
Packages
Cold Chamber
Expedition
Cutting Room
Storage for Boxes
Storage for Packages
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Slaughterhouse Quail
OPTIONAL SERVICES:
- Financial Feasibility Study of Slaughterhouse Quail with capacity for 3.000 animals per day.
- Business plan for Slaughterhouse Quail with capacity for 3.000 animals per day.
- 3D project of Slaughterhouse Quail with capacity for 3.000 animals per day.
Projects with other capacities
Slaughterhouse Quail
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Quail Refrigerator - Reception Platform | Assembling Quails for Slaughter | Quail Slaughterhouse | Lipstick Industry in Brazil | Auto Parts Store Floor Plans | How to set up a pasta store | Create a Bank Branch in C23 | Candy Store Assembly | Peanut Brittle Making Method | Homeopathy Business Plan | Wastewater Treatment Project Companies | Swimming School Floor Plans | Ready-Made Sausage Factory Project and Cost | How to Set Up a Soccer Court | How to Design a Surgery Center | Project to Open a Physiotherapy Clinic | Machine Projects for Gyms | Financing for Bars Restaurants Bnds | Project How to Set Up a Gym | Bowling Alley Installation Plan | Car Wash Plant | Plant for Children's Birthday | Water Analysis Laboratory Assembly | Equipment for Tobacco Crushing Industry | What You Need to Open a Knitting Factory | Clothing Factory Floor Plan | Decorative Glass Factory Poços De Caldas | Plastic Recycling Plant Project | Wood Treatment Autoclave Plant Assembly Project | How to Set Up a Brick and Cement Block Factory | Solar Heater Project In DWG | Where to Buy Paper Candy Wrappers | Washer Manufacturing Description | Organizational Chart of a Dairy Company | Roquefort Cheese Price | Opening Body | How to Organize a Bedroom and Study Room | Pop Model Pharmaceutical Services | Standard Operating Procedure for Washing Glassware in a Clinical Laboratory | Set Up Bus Company | How to Organize a Body Shop | How to Set Up a Fast Delivery Company | Restaurant Menu Graphics | How to Rent a Sound Company | Fruit Ice Cream Sales Warehouse | I want to set up a pastry dough industry | Plant Nursery Business Is Good | Frozen Potato Production | How to Implement a Coconut Water Distributor | Oil Flowchart | Project to assemble a crematorium |
Other projects ready:
How to start Drinks and Soft Drinks Deliverer with volume of 3.000 liters/day.
Project Industry to Produce Footwear with capacity for 300 pairs/day.
PDF Swine Farm (with Overlapping Bed) with capacity to Produce 224 Matrix.
Plant and layout Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water with a machine to make PET Bottles.
Project Tanning Ostrich Skin with capacity to Produce 100 Skins per day.
Project Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 150 animals/day.
FeasibilityCleaning Company with an area of 300 m2.
Business plant Clothing Industry to Produce Tactel Pants and Jackets with capacity for 100 garments/day.
Project Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 5.000 Kg/day.
How to start Milk and Dairy Industry to be built in 2 phases: 1st phase: Fresh Cheese production (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan, with 178 m2 (212,98 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Amplification to Produce Yoghurt and Milky Beverages, with 216 m2 (258,33 sq.yd.) of total area and capacity for 6000 liters/day.



