Ready project Slaughterhouse Swines with capacity for 300 animals/day.

CODE - FRS-019

Ready project Slaughterhouse Swines with capacity for 300 animals/day.

CODE - FRS-019


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Swines
Future Stunning area for Bovines
Evisceration
Inspection Department
Entrance Hall
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Reception Room for Bristles and Hoof
Section for Small Guts
Cold Chamber for Small Guts
Small Guts Packaging
Guts and Small Guts Expedition
Lower Floor:
Rendering Reception Section
Reception area for hooves
Rendering:
Bone Section
Dry Blood Section
Garage
Ofiices
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Swines

How to start Slaughterhouse Swines with capacity for 300 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Swines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Poços De Caldas Refrigerator Assembly | Refrigerator Assembly | How to Get Financing to Set Up a Free-Range Chicken Farm | How to Set Up a Disinfectant Factory | How to Open a Screw Company | I Want to Open an Oil Change Shop | How to Set Up a Business to Sell Roast Chicken | How to Set Up a Fish Market | Selling Tempered Glass Is A Good Business | The Layout of a Clothing Store | Beverage Distributor Project Template | Project to Set Up a Nursery | Cost To Raise Ostrich Construction | Sausage Factory Equipment List | Shrimp Feed Factory Project | Sterilization Material Center Flowchart and Standard Operating Procedure | Plan of a Polyclinic | Vaccination Room Financial Viability | Finame Bodybuilding | Fishing and Paying Assembly | Marmitex Delivery Business Plan | Bar Plan Templates | Projects for Setting Up a Snack Bar | Building Schedule | Pop Blood Collection Room | Paint Industry Plant | Underwear Production and Cost | Flowchart About Ball Production | How to Set Up a PVC Lining Industry | Styrofoam Sheet Santa Catarina | How to Start a Broom Company | Matchstick Company | Mortar Factory Project | Egg Box Factory | Equipment for Setting Up a Metalworking Shop | Yellow Zinc Plating Wells | Soil Analysis in Poços De Caldas | Economic Feasibility Project Model for Dairy Industry | Good Manufacturing Practices Manual for Cosmetics | Bodywork and Painting Greenhouse Model Project | How to Set Up a Quail Egg Preserving Industry | Pop for Hospital Kitchen | LPG Gas Distributor Profitability | What Do I Do to Get a Loan to Set Up a Barber Shop? | How to Set Up a Representation Office | Office Facade Model | Material for assembling chandeliers | Surveillance Company Flowchart | Pig Farming Sheds | Pastry Dough Distributor | Pamonha Process Design Flowchart Template | Coffee Production 2c Flowchart2c Instant Coffee | How to Make Powdered Soft Drink | Flowchart for Dog Boarding |

 

Other projects ready:

How to start Factory to Produce Paper Coffee Strainer with capacity for 500 boxes/day.
Project Industry to Produce Veterinary Soap with capacity for 20.000 Kg/day.
PDF Factory to Produce Barbecue Coal with capacity for 1.000 Kg/day.
Plant and layout Factory to Produce Pickles with capacity for 1.000 Kg per day.
Project Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 500 garments/day.
Project Factory to Produce in natura Garlic with capacity for 5.000 Kg per day.
FeasibilityPre-School with capacity for 1.000 children per day.
Business plant Smoker with capacity to produce 100 Kg/day.
Project Factory to Produce Synthetic Marble with Plastic Resin with capacity for 500 pieces per day.
How to start Tanning Ostrich Skin with capacity to Produce 1.000 Skins per day.

Project - how to start Slaughterhouse Swines with capacity for 300 animals/day.