Ready project Slaughterhouse Wild Boar with capacity for 100 animals per day.

CODE - FRE-025

Ready project Slaughterhouse Wild Boar with capacity for 100 animals per day.

CODE - FRE-025


Project ready with:


Industry with the following sections:

1º Floor:
Wild Boar Stunning
Evisceration
Inspection
Pre-Chamber
Freezing Tunnel
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Sector
Cold Chamber for Small Guts
Small Guts Packing
Guts and Small Guts Expedition
Lower Floor:
Rendering Reception Sector
Hoof Reception Sector

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Wild Boar

How to start Slaughterhouse Wild Boar with capacity for 100 animals per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Wild Boar

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Financing for the Construction of the Cold Storage Facility | Ostrich Picket Project | Make Pillow | Milking Parlor Models | Bookstore Business Plan | Is It Good To Set Up A Hospital Supplies Store? | Basic Design for an Ice Cream Shop | Glassworks Expedition | How to Set Up a Shoe Store in Management | Drug Distributor Project Template | Structure for Setting Up Meal Delivery Companies | Bnds and Driving School | Noria for Slaughtering Pigs | Sports Gym Plants | Financing to Open a Health Clinic | Basic Equipment for a Plastering Room | How to Plan an ICU | Economic Viability of a Cyber Cafe | Self-service Restaurant Project | Project for Collective Meals | Suppliers to Set Up a Nightclub | Car Wash Business Plan | Financial Plans for Children's Buffet | Serpentarium Model Floor Plan | Parts for Assembling Tents | How to Implement a Clothing Industry | Sewing Factory Production | How to Start a PVC Pipe Company | Upholstery Factories | Machines That Make MDF | Counters and Shelves Building Material | Post Forms | Work By Production Of Envelopes | Countries that manufacture aluminum frames | Assemble Pallet Rack Factory | Requirements for Setting Up a Dental Prosthesis Laboratory | Ice Cream Shop Inspection Model | How to Set Up a Water Factory | Example of a parking layout | Hotel Operational Procedures Manual | Pop Snack Bar Standard Operating Protocol | Financing for Beauty Salon | How to Set Up a Funeral Home | Procedure for Setting Up a Van Rental Company | I Want A Ready-Made Business Plan For A Real Estate Company | Vehicle Washing Flowchart Examples | Studio Floor Plan | I Want to Set Up a Pig Farm | Open a Homemade Pasta Business | Company Produces Acaraje | Organic Mayonnaise Production | Ready Project About Açaí Resale | Tomato Paste Production Machine | How to Make a Pet Shop Floor Plan |

 

Other projects ready:

How to start Industry to Produce Shampoo and Body Soap with capacity for 500 Kg/day.
Project Factory to Produce Chocolate with capacity for 1.000 Kg/day.
PDF Factory to Produce Soap Powder with capacity for 10.000 Kg/day.
Plant and layout Factory to Process Grated Coconut, Coconut Water and Coconut Milk (Dryed Coconut), with capacity for 3.000 kg per day and area of 375 m².
Project Cachaça (Liquor) Factory, with an area of 150 m² and capacity for 200 liters/day. (To be built in a different level land).
Project Factory for Corn Flour production with capacity of 8.000 kg/day and 400 m2 (478,4 sq.yd.) area.
FeasibilityCold Storage Room to Produce Fresh, Frozen, Salted, Dried, Smoked and Breaded Fishes, Hamburgers and Fish Products with capacity for 1.000 Kg/day.
Business plant Complete Farm for Swine with one Shed with capacity for 9 Matrix and Built area of 110 m² (with Overlapping Bed).
Project Clothing Industry to Produce Stuffed Animal with capacity for 500 garments/day.
How to start Slaughterhouse Bovines, Swines and Caprines with capacity for 30 animals per day.

Project - how to start Slaughterhouse Wild Boar with capacity for 100 animals per day.