Ready project Factory to Produce Chalk with capacity for 3.000 Kg/day.
CODE - IND-004
Ready project Factory to Produce Chalk with capacity for 3.000 Kg/day.
CODE - IND-004Project ready with:
Industry with the following sections:Reception of Raw Material
Storage of Raw Material
Manufacture Room
Drying
Packaging
Storage of Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Chalk
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Chalk with capacity for 3.000 Kg/day.
- Business plan for Factory to Produce Chalk with capacity for 3.000 Kg/day.
- 3D project of Factory to Produce Chalk with capacity for 3.000 Kg/day.
Projects with other capacities
Factory to Produce Chalk
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
How to Make School Chalk | I Want An Example Of A Chalk Company Organization Chart | I Want to Make a Chalk Factory | How to Make School Chalk | With It Is A School Chalk Production | School Chalk Industry | Budget to Build an Apiary | Biodigester Plant for Small Properties | How to Start a Fabric Softener Business | 100m2 Floor Plan In 3D | Financing Model Aircraft | What Do I Need to Open a Hospital Products Company? | Setting Up a Cold Cuts Store Sebrae | List of Self Service Equipment | Example of Ready-Made Projects for Glassworks | See How to Make Underwear | How to Set Up an Equipment Distributorship | Setting Up A Food Deal | Playroom Projects and Plans | Refrigeration Equipment | House Plan 500 M2 | Multi-Sport Court Layout | List of Materials for a Medical Clinic | Ubs With X-ray | DWG Project For 5 Bed UTI How Much Does It Cost? | How to Set Up a Coffee Shop | Layout of a Neighborhood Grocery Store | Seafood Restaurant Planning | Budget How Much Will It Cost to Set Up a Dance Club? | Car Wash Project | Party Houses Viability | Buy Bee Venom R24 | Stamp Templates In Dwg | Blouse Assembly | How to Set Up a Polo Shirt Factory | Pet Bottle Broom Factory | Sofa Covers In Brazil | Setting up a Furniture Restoration and Manufacturing Company | Flowchart of a Card Production | Asphalt Plant Flowchart | Egg Tray Machine | How to Set Up a Hardware Industry | Lunchbox Factory | Set up Veterinary Laboratory | What is Organic Cheese? | How Much Does It Cost to Set Up a Mineral Water Factory? | Parking Models | Pop Model Standard Operating Process | Restaurant Standard Operating Process | Beauty Salon Layout Dwg | Organic gardening in greenhouses | Ready Business Plan Trackers | How to Make a Project to Open a Consulting Company | Company Maintenance Layout | How to Set Up a Filming Studio at Home | Popsicle Factory | Ingredients for Making Pasta Dough | Hot Dog Production | How to Set Up a Cashew Factory | Construction for Frozen Fruit Pulp | Ketchup Production | Website for Veterinary Clinic Plants |
Other projects ready:
How to start Clothing Industry to Produce Heavy Fabrics (Canvas) with capacity for 1.000 garments/day.
Project Basic Health Unit with an area of 250 m2.
PDF Industry to Produce Bleach with capacity for 3.000 liters/day.
Plant and layout Cold Storage Room to Produce and Dry Shark Fin, Fish Swim Bladder and Fish Hamburguers with capacity to Produce 5.000 Kg/day.
Project Slaughterhouse for Swine - 50 animals/day - area of 500 m² (598 sq.yd).
Project Milk and Dairy Industry to Produce Autoclaving UHT Milk with capacity for 3.000 liters/day.
FeasibilityEgg Sorters with capacity for 10.000 Eggs/day.
Business plant Farm to Produce and Slaughter Broiler Chickens with: Farm and Slaughterhouse and capacity for 5.000 Chickens per day.
Project Drink Deliverer with capacity for 3.000 liters/day.
How to start Clothing Industry to Produce Shirts with capacity for 500 garments/day.



