Ready project Smoker with capacity to produce 100 Kg/day.

CODE - FRIG-190

Ready project Smoker with capacity to produce 100 Kg/day.

CODE - FRIG-190


Project ready with:


Industry with the following sections:

Reception
Manipulation Room
Smoker
Expedition
Selling Area
Office
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Smoker

How to start Smoker with capacity to produce 100 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Smoker

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Assemble a 100kg Smoker | Small Project To Build A Smoker | Smoker 100 kg | 100kg Smoker | Smokehouse Floor Plan | Chicken Slaughtering Equipment | Open Cleaning Products Factory | I Want to See a Soap Factory | Organizational Chart of a Building Material Company | How Much Does It Cost To Set Up An Oil Change Shop | Draw Farm Plan | Which Fruits for Retail | Open a Pool Products Store | Open Sock Shop | How to Make Coconut Candies | Layout for Pharmaceutical Distribution Center | Nursery Capacity | Anaerobic Filter Layout | How to Fry Ready Skin | Salted Fish Project | Donation Ready Project | Setting Up a Hospital Waste Incineration Company | Hospital Waste Incinerator Gas Deposit | Floor Plan Of Suites In Cad | Setting Up a Lan House Floor Plan | Marmitex Disk Model | Budget for Gas Station Equipment | Flat Snack Bars | Examples of Relaxing Massage Rooms | Synthetic Marble Industry for Sale | Jeans Manufacturing Layout | Gypsum Formwork P2f For Sale | How to Start a Glass Company | Styrofoam Distributor --rj | How to Make Briquettes | How to Build a Pallet Business | Flowchart of the Production of Gypsum Artifacts | Scarf Making Machine | How Can I Set Up a Recycling Depot? | Soil Analysis for Construction | Dulce De Leche Floor Plan | Good Industrial Practices Manual Template | Paint Revitalization Company Assemble | How C9 Made Egg Powder | Getting Started Manual Template | How to Set Up a Gas Distributor in MG | How Much Does a Hydroponics Greenhouse Cost? | Surround Sound Installation Manual | Ready-made Billing Flowcharts | How to Set Up an Eco-Friendly Business | Isotc3b4nicos Manufacturing | Pop Model In Bakery | Host Factory | Cassava Flour Budget | Coffee Industry Project | Passion Fruit Juice Industry Flowchart | Pet Hotel Floor Plan |

 

Other projects ready:

How to start Factory to Produce Water Rakes with capacity for 1.000 units per day.
Project Factory to Produce Ready Frozen Raw Savory Pastries (Salgadinhos) Assados e Fritos (Coxinha, Pasty, Esfiha, Kibe, Hamburger) with capacity for 5.000 Kg/day.
PDF Factory to Produce Ice Cream Spade with capacity for 500 Kg/day.
Plant and layout Industry to Produce Veterinary Shampoo with capacity for 1.000 Kg/day.
Project Industry to Produce Footwear with capacity for 50 pairs/day.
Project Factory to Produce Pepper Paste with capacity for 5.000 Kg per day.
FeasibilityFactory to Produce Mattress with capacity for 5.000 mattress per day.
Business plant Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters and plastic cups.
Project Factory to Produce Sausages (with Carcass Reception) with capacity for 3.000 Kg/day.
How to start Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 500 Kg/day.

Project - how to start Smoker with capacity to produce 100 Kg/day.