Ready project Smoker with capacity to produce 50 Kg/day.

CODE - FRIG-188

Ready project Smoker with capacity to produce 50 Kg/day.

CODE - FRIG-188


Project ready with:


Industry with the following sections:

Reception
Manipulation Room
Smoker
Expedition
Selling Area
Office
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Smoker

How to start Smoker with capacity to produce 50 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Smoker

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Make a Smoker | Smoker Drawing | How to Design Dis and Production | Make a Smoker | Smoker Drawing | How to Make a Smoker | Meat Smoker Project | Assemble a Smoker | Fruit Pulp Cocktail | Free Range Chick Suppliers | Financing for Rabbit Breeding | Wine Cellar - Dwg | What Products Do I Need for an Electrical Supply Store? | Assemble Lubrication Center | Exhaust Shop Layout | Setting Up a Fruit and Vegetable Business | How to Start a Toy Rental Company | How to Open a Jewelry Store | Mold for Assembling Tablets | Food Distributor Business | Tire Recycling Plant Design | Ready Budget for a School | Shrimp2cbeneficiation | Refrigerator Facades | Physiotherapy Company Project | Project for Radiology Room | How to Make a Memorial for a Three-Story Hospital | Motel Projects Models | Equipment for Opening a Swimming School | Industrial Kitchen Floor Plan Project | Gas Stations Plant | Floor Plan of a Fast Food | Estetica Clinic Business Plan | Disposable Diaper Business Plan | I Want to See How the Alcohol Gel Process Works in Industry | Organizational Chart of a Clothing Company | Polyester Button Factory | Layout of a Plastic Industry | Piranha Hair Clip Factory | Production of Preachers | One Pool Project | Concrete Post Manufacturing Model | Iron Casting Factory In Brazil | Furniture Industry Business Plan Template | Clinical Analysis Laboratory Floor Plan | How to Set Up a Dairy Factory | Epi Distributor Opening | Budget for Setting Up a Mechanical Workshop | Pops P Distributors | 3d Rodeo Projects | Bucket Assembly Flowchart Templates | Digitalization Project | What Materials Do You Need to Set Up an Advertising Company? | Mount Cellular Maintenance | Cartridge Refill Store Opening Project | Ecological Brick Feasibility Study | Materials for Starting a Party Snack Business | Popcorn Industry | Know How to Open a Micro Tea Production | Kennel Project |

 

Other projects ready:

How to start Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 500 Kg per day.
Project Grated Cheese factory with capacity of 1000 kg per day.
PDF Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 1.000 garments/day.
Plant and layout Factory to Produce Pasta and Frozen Ready Dishes with capacity for 300 Kg/day.
Project Factory of Biscoito de Polvilho (SnackSnow Puffs), with capacity for 5.000 kg/day.
Project Factory to Produce Melzinho (Honey, Sweet Milk (Fudge) and Glucose Syrup) with capacity for 1.000 kg/day.
FeasibilityManipulation Pharmacy with an area of 150 m².
Business plant Industry of Ice Production in cubes with capacity for 1.000 Kg/day.
Project Factory to Produce Humid handkerchiefs with capacity for 3.000 units per day.
How to start Milk and Dairy Industry for Fresh Cheeses (Minas Frescal, Ricota, Muzzarela) with area of 122 m² (145,91 sq.yd.) and capacity for 3.000 liters/day.

Project - how to start Smoker with capacity to produce 50 Kg/day.