Ready project Pre-School with capacity for 700 children per day.

CODE - ESC-025

Ready project Pre-School with capacity for 700 children per day.

CODE - ESC-025


Project ready with:

Project with the following sections:
Reception
Rooms
Pharmacy
Admission Office
Social Worker
Canteen
Storeroom
Kitchen
Pantry
Women's Bathrooms
Men's Bathrooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Pre-School

How to start Pre-School with capacity for 700 children per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Pre-School

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Nursery School Project | Fundraising Project in Early Childhood Education | Nursery School Project | Ready-made Scheme to Set Up a Nursery School | List of Equipment for Micro Brewery 1000 L2fdia | Granjas De Corte2c Interior De Sp | Cleaning Products Factories | Floor Plan - Soap Industry | How to Start a Screw and Tool Business | Requirements for Opening an Oil Change Business | I Want to Set Up a Chicken Roasting Business 2c What Do I Need? | Bakery Project Template | How to Set Up an Awning Manufacturing Company | How Much Does It Cost to Open a Country Store | Blueprint of a Chocolate Company | Financial Viability to Set Up a Distributor | Documentation for setting up a nursery | Restaurant Effluent Treatment System Design | Crackling Machine | Fish Refrigeration Machines | Set up a Psychosocial Study | Documents to Open an Incineration Company | Incinerator Project Cost | Motel Project | Floor Plan Templates for Pastries | Marmitex Kitchen Products | Wet Sauna Design | Barsplants | Video Store Schedule | Hospital Bacteriology | Financing for Recycling Companies | Tencel Pants | Raffia Bags How to Assemble | How to Set Up a PVC Lining Factory | Styrofoam Manufacturing Equipment | Briquette Industry Financing | How Much Does a Pallet Cost? | Open Tile Factory | Notebook Factory - Assembly Line | Metalworking Website Layout | Gas Cylinder Manufacturing Processes | Soil Analysis Laboratory Equipment | List of Machines to Open a Dairy | Dairy Equipment Preventive Maintenance Manual | Vehicle Transformation for the Disabled | Organizational Chart of an Egg Powder Industry | Pops Model | Low LPG Resale Palantas | Hydroponics Shed Project | Orange Juice Extractor Company | Law Office Project | Assemble Upholstery Reform | Car Company Ready Planning | Quantitative Flowchart for Cake Mix | To Set Up a Bakery | Pupunha Palm Heart Industry | Soy Processing Company | Cajuina Production | Dog Hotel Project |

 

Other projects ready:

How to start Factory for processing of Tomato Extract with 500 m² (598 sq.yd.) area and capacity of 7.500 kg of fruits/day.
Project Factory to Produce Macaroni for Fresh and Dry Pasta with capacity for 10.000 kg/day.
PDF Factory Milk Powder Packing (with Mixture) with capacity for 30.000 Kg/day.
Plant and layout Slaughterhouse to Sluaghter Bovines and Swines with capacity for 30 Bovines and 50 Swines per day (this capacity can reach 60 Bovines and 100 Swines day) with1.020 m² (1.220 sq.yd) of constructed area, with room of Boneless Meat and Cold Storage for Boneless Meat. Note.: This project is an amplification of FRIG-02 increasing the Room of Boneless Meat.
Project Buffet with capacity for 750 people.
Project Industrial Bakery to Produce Cakes with capacity for 500 Kg/day.
FeasibilitySlaughterhouse Ovines with capacity to slaughter 300 animals/day.
Business plant Factory to Produce Pepper Powder Packed in Capsules with capacity for 100 Kg/day.
Project Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 3.000 Kg/day.
How to start Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Deboned Meat Reception) with capacity for 3.000 Kg/day.

Project - how to start Pre-School with capacity for 700 children per day.