Ready project Tannery Caprine Skin with capacity to Produce 1.000 skins/day.

CODE - CTM-028

Ready project Tannery Caprine Skin with capacity to Produce 1.000 skins/day.

CODE - CTM-028


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Caprine Skin

How to start Tannery Caprine Skin with capacity to Produce 1.000 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Caprine Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tannery Project Model | Goat Tanning Machine | How to Set Up a Tannery | Economic and Financial Viability of a Tannery | Set up a goat tannery | Tanning Equipment | Tannery Equipment | Goat Tanning Machines | How Goats Are Raised | Tannery Viability | Tannery Equipment | Pre Goat Tanning | Goat Tannery | Tannery Machines | Goat Design Template | Equipment for a Goat Tannery | Machine for goat tanning | Soap Making Resources | Location2c Capacity and Physical Arrangement Articles | Layout for a 500m2 company | Snack Bar Flowchart | Organizational Chart of a Rental Company | I Want to See a Clothing Repair Shop | Mocoto Jelly Production | What You Need to Set Up a Beverage Store | How to Write a Project for Recycling Funding | What You Need to Open a Technical School | Floor Plan for Small Butcher Shop | Investment to Set Up a Cattle Slaughterhouse | Material Used in a Company's Outpatient Clinic | Dental Radiology Clinic Layout | Critical Report of a Dental Clinic | I Want to Build a Convention Center in a Hotel | How Much Does It Cost to Set Up a 6D Cinema? | How to Set Up a Campim Area | Architectural Design of Gas Stations | What Do I Need to Set Up a Brewery at Home? | Aesthetic Clinic Graphic Plants | Pillow Factory Project | How to Set Up a Toilet Paper Factory | How to Set Up a Doll Factory | Linen Factory (55) | Raw Material for Havaianas Style Flip Flops | Rubber Project Schedule | Popsicle Stick Work For A Factory School | Miniature Plane Blueprint | How Much Does It Cost to Set Up a Precast Slab Factory | Teak Project Template for Financing Approval | I Want to Set Up a Brick Factory | How to Make Traffic Signs | Model Clinical Analysis Laboratory | Yogurt Factory Layout | Hotel Laundry Project | Mechanical Workshop Models | Brazilian Cities with 5000000 Inhabitants | Sa25c325bade Unit Cleaning Pops | Projects for the Exhibition Arch | How to Build a Sewing Studio | How to Set Up a Pest Control Company Legislation | Capacity of an Insurance Broker | What Material Is Used to Assemble a Bicycle? | Ready-Made Business Plan for Cleaning Company | Agricultural Floor Plan | Factory Making Tiles With Cement And Paper | Ice Cream Cone Packaging | Cashew Juice Industrialization Flowchart | Soup Kitchen Project Templates | Company That Produces Puba | Veterinary Clinic Floor Plan |

 

Other projects ready:

How to start Hotel (Resort) and Convention Center with 100 apartaments.
Project Complete Caprine Area with capacity for 90 Caprines, Including: Breeding, Milking and Factory to Produce Goat Milk Cheese.
PDF Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 8 Blocks per Week.
Plant and layout Factory to Produce Leather Scrap Bones (for Dogs) with capacity for 500 Kg/day.
Project Factory to Produce Sweet Milk in Sachet (Chup-Chup) with capacity for 3.000 Kg/day.
Project Factory Coffee Roasting with capacity for 5.000 Kg/day.
FeasibilityBrewery with Bar, Restaurant and Brewery and Chopp Factory with capacity for 1.000 liters/day.
Business plant Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 3.000 Units per day.
Project Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 300 garments/day.
How to start Industry to Produce Bleach with capacity for 10.000 liters/day.

Project - how to start Tannery Caprine Skin with capacity to Produce 1.000 skins/day.