Ready project Tannery Frog Skin with capacity to Produce 300 skins/day.

CODE - CTM-043

Ready project Tannery Frog Skin with capacity to Produce 300 skins/day.

CODE - CTM-043


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 300 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Layout of a Tannery | Layout of a Tannery | Frog Tannery | Layout of a Tannery | Frog Tannery | Soap Machine Factory | Set up Nini Market | Tool Rental Is A Good Business | How to Set Up a Dental Supply Store | I Want to Set Up a Refrigeration Company | Baby Store Layout | Costume Rental Store Facade | Equipment for compounding pharmacy | Packaging Industry | Projects to Assemble for Computer School | How to Set Up a Sheep Slaughterhouse | Crematory Furnace Drawing | Multi-sport court plan Dwg | Medical Clinic Physical Plan | UBS Physical Plan | Ready-Made Business Plans in the Nursing Area | Cafeteria Ready Project | How to Set Up a Supermarket Business Plan Ready | What are the materials of an experimental kitchen? | Nightclub VIP Box Floor Plan | Car Wash Design How to Assemble | Party Hall Feasibility | What is Polyelectrolytic Concentrate for Hemodialysis? | Machines for Making Mechanical Paste | Industries That Sell Leather To Make Clothes | How to Start a Polo Shirt Business | Pet Grooming Machine Companies in Brazil | Concrete Drinking Fountain Factory | How to Open a Coal Factory | How to Make a Project to Set Up a Coffin Factory | How to Set Up an Asphalt Factory | Cardboard Tube Manufacturer | Assemble an Iron Warehouse for Construction | Motorcycle Exhaust Manufacturer | How to Set Up an Animal Clinical Analysis Laboratory | Dairy Factory Business Plan | How to Open a Parking Lot in Goiania | Standardized Operating Plan for the Food Industry | How to Make a Clinical Analysis Pop | Beauty Salon Equipment Budget | How to Set Up an Organic Garden | How to Start a Vehicle Tracking Business | Rh.proj | How to Set Up a Refrigeration Company | Plans for Studio Filming | Popsicle Factory Project | Spaghetti Factory | What Do I Need to Set Up a Biscuit Factory? | How to Set Up a Fruit Juice Unit | Tomato Paste Making Machine | Cosmetics Production Schedule |

 

Other projects ready:

How to start Improvement Unit of Seed (Corn and Soybean) with capacity for 500 Kg/day.
Project Factory to Produce Lipstick with capacity for 10.000 kg/day.
PDF Factory Improvement of Vegetables (lettuce, acelga (swiss chard), borecole, cabbage, carrot, beetroot, cucumber, beans-string bean, cauliflower and broccoli) with capacity to produce 3.000 Kg per day.
Plant and layout Mineral Water Deliverer with capacity to Produce 1.000 liters/day.
Project Factory to Produce Cachaça of Honey with capacity for 3.000 liters/day.
Project Smoker with capacity to produce 70 Kg/day.
FeasibilityFactory for Betterment and Drying of coffee with 1.200m² (1435,2 sq.yd.) area and capacity of 40.000 kg/day.
Business plant Slaughterhouse Industrialization and Slaughtering of Bovines and Swines with capacity for 20 Bovines and 30 Swines per day with a Built area of 468 m².
Project Factory to Produce Ice Cream and Fruit Pulp (Ice Cream + Pulp) with capacity for 5.000 Kg/day.
How to start Factory for Manioc (Cassava) Starch with capacity for 10.000 kg de polvilho per day.

Project - how to start Tannery Frog Skin with capacity to Produce 300 skins/day.