Ready project Tannery Frog Skin with capacity to Produce 50 skins/day.

CODE - CTM-041

Ready project Tannery Frog Skin with capacity to Produce 50 skins/day.

CODE - CTM-041


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 50 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tannery Construction Project | How to Skin a Frog | Ctm-041 Frog Skin Tannery With Production Capacity Of 50 Skins/Day. | Rice Alcohol Project | Exotic Birds Construction Model | Cosmetics Industry Plants | Goat Shed Project | How to Set Up a Digital Photo Printing Shop | Tire Sales Shop Projects | Rotisserie Production Capacity | What It Takes to Open a Plaster Shop | Suggested Names for Children's Thrift Stores | How to Start a Pharmaceutical Company | How Much Does It Cost to Open a Food Basket Business? | Driving School Business Plan Example | Cattle Slaughter Guts | Mini Swine Slaughterhouse Equipment | Floor Plan of a Multi-Sports Gym | Medical Clinic Facade | Healthcare Organizational Chart Template | Uti Preparation | Company Plan..buffet | Self Service Restaurant Flowchart | Food Supply2fcizinha Industrial | How to Set Up a Concert Hall | Basic Car Wash Project Template | Project - Children's Buffet - Floor Plan | How to Make a Serpentarium Building Models | Mattress Factory Open | Clothing Production Project | Uniform for Production | TNT Bags Price | Machine to Produce Espopor | Coal Bagging Machine | I Want to Set Up a Wooden Door and Window Business | How to Make Concrete Posts | Machines for Cardboard Box Production | How to Assemble Metal Frames Manufacturing | Hot Galvanizing Project | Dental Prosthetics Laboratory Plants | How to Start a Yogurt Ice Cream Business | Good Practices Manual for Mini Markets | Bicycle Factory Layout | How to Create a Standard Procedure Manual | Template for Placing Pops in Restaurants | How to Create a Funeral Business Plan | How to Open Devans | Virtual Office Business Plan Template | Dry Car Washing Business | Audio Studio Business Plan | How to Make Pig Bedding | Sweets Drawing | How to Set Up a Stuffed Cookie Factory | Eucalyptus Oil Plant | Equipment for Making Acai Pulp | Sauce Manufacturing Process | Pet Shop Form |

 

Other projects ready:

How to start Factory to Produce Mixture of Powder Soy with capacity for 3.000 Kg/day.
Project Factory for Manioc (Cassava) Starch with capacity for 10.000 kg de polvilho per day.
PDF Factory to Produce Pies with capacity for 500 Kg/day.
Plant and layout Factory to Produce Powder Cheese Bread with capacity for 5.000 Kg/day.
Project Factory to Produce Natural Cosmetics with capacity for 1.000 Kg/day.
Project Factory to Produce Cashew Nut with capacity for 10.000 Kg/day.
FeasibilityFactory to Produce Cold Meat (with Carcass Reception) with capacity for 3.000 Kg/day.
Business plant Factory to Produce Pickles with capacity for 3.000 Kg per day.
Project Factory for automatic processing of Green Corn with 500m² (598 sq.yd.) and capacity of 7.500 kg/day.
How to start Factory to Produce Brooms with capacity for 30.000 units per day.

Project - how to start Tannery Frog Skin with capacity to Produce 50 skins/day.