Ready project Tannery Frog Skin with capacity to Produce 5.000 skins/day.

CODE - CTM-048

Ready project Tannery Frog Skin with capacity to Produce 5.000 skins/day.

CODE - CTM-048


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 5.000 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Frog Tanning | 50 Animal Corral Model | Shampoo Factory Costs | Business Plan for a Sports Equipment Store | Car Rental Company Flowchart | Open a Car Dealership | Ready-made Chocolate Project Model | Jewelry Store Facade | Tanneries | Drugstore Floor Plan | C3a0 Horse Refrigerators For Sale | Burger Shop Business Plan | Football Field Design Template | Floor Plan of a Surgical Center | Physiotherapy Ebook | View Drawing of a Physical Plan of a Uti | Project to Invest in a Hotel Example | Supermarket Projects | Yoga Classes Cost In Poços De Caldas | Bowling Alley Cost#sclient=psy | Cost of Car Wash Equipment | Suggestions for Marmitex Names | Dental Pen Raw Material | Bushing Manufacturing Machines | Clothing Industry Floor Plan | Easy Newborn Souvenirs | Paper Cup Made in Brazil | Who Produces Plastic Wood? | MDF Toy Chest | How to Build a Concrete Block Manufacturing Schedule | Complete Plant Project In Dwg | Projects for Cardboard Box Industry | How to Open a Vehicle License Plate Factory | Mobile Roof Project | Photos and Names of Laboratory Equipment | Industrial Floor Plan Drawings | Water Distributor Account Plan#q=Water Distributor Business Plan | Set Up Battery Factory | Pop27s Template for Cosmetic Distributor | Pop Disinfection of Reusable Utensils | How to Start a Freight Forwarding Company | Model Seedling Nursery | How to Set Up a Moving Company | Maintenance Workshop Project | Ice Cream Factory Project in the State of Pará | Pasta Business Plan | Wine Production Equipment Suppliers | Japanese Peanut Maker | Rich Soy Steak Factory | Model Project About A Cemetery |

 

Other projects ready:

How to start Factory T-Shirt Screen Printing with capacity for 100 garments/day.
Project Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 25.000 liters/day.
PDF Milk and Dairy Industry to be built in 2 phases: 1st Phase: Milk Packing, with an area of 95 m2 and capacity for 4.000 liters/day. 2nd Phase: Milk Packing and Organic Cheese Factory to Produce Fresh Cheese, Yoghurt and Milky Beverages, with an area of 200 m2 and capacity for 8.000 liters/day.
Plant and layout Smoker with capacity to produce 10 Kg/day.
Project Factory to Produce Mead, Vinegar made from Honey, Cachaça of Honey and White Wine (Prosecco) of Honey with capacity for 300 liters/day.
Project Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 500 Kg/day.
FeasibilityProjeto de Frigorífico para Abate de Bovinos (Abate pelo Método Kosher) with capacity for 200 animais por day e área de 3.000 m2.
Business plant Factory to Produce Wine, with capacity for 10.000 liters/year.
Project Microbrewery, with capacity for 3.000 liters/day.
How to start Factory for toasted Chestnut industrialization with production capacity of 400 kg/day and 150m2 (179,4 sq.yd.) area.

Project - how to start Tannery Frog Skin with capacity to Produce 5.000 skins/day.