Ready project Tannery Frog Skin with capacity to Produce 750 skins/day.

CODE - CTM-045

Ready project Tannery Frog Skin with capacity to Produce 750 skins/day.

CODE - CTM-045


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 750 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Frog Skin Tannery | Frog Skin Tannery | Frog Tanning | Tanning with Frog Skins | Deodorant Production | Computer Store Projects | How to Set Up a Nautical Equipment Store | Gas Station Model In DWG | Juice Bar Research Spreadsheet Template | Disposable Products Store Template | Embroidery Machine Business Plan | Fruit Jelly Factory | How to Assemble a Small Beverage Tank | I want to set up a scrapyard | Project Template for Computer Science Classes for Senior Citizens | 1000 Birds Slaughter Project | Society Football Court Project | Rx Room Projects | Office Plans Projects and Floor Plans Various | Companies That Design Industrial Kitchens | Organizational Design of a Spa | Pizzeria Utensils How to Assemble | Retirement Home Floor Plan | How to Set Up a Massage Room | Machine Model for Manufacturing Physiological Serum | I want to open a marble shop. What do I need? | T-Shirt Prints for Construction Material Warehouse | Curtains for Production | Soles Factory Production Flow | Sign Design Template | Skewers Factory | Shopping Bathroom Drawing.dwg | Setting Up a Block Company | Stove Production | Brick Machine, Pottery | Wire Sieve Manufacturing | Macroscopy Room Projects | Yogurt Distributor Petropolis | laundry business plan template | Layouts De Oficina Moto | Skate Park Setup Program | I Need A Pop Pharmacy Set Up | Ppho Flowchart | Sewing Plant Template | Setting Up a Security Center | Fire Prevention Project LPG Distributor | Air Conditioning Installation Project Sample In Dwg | How to Set Up Radio Taxi Companies | How to Open an Organic Fertilizer Factory | Tile Production Project | French Bread Production Budget | Layout For Orange Juice | Plastic Greenhouse for Mushroom Production | Granola Factory | Ointment Production Flowchart |

 

Other projects ready:

How to start Factory to Produce Popsicles with capacity for 1.000 Kg/day.
Project Slaughterhouse Poultry Slaughter, Cold Meat Production, Smoked Products and Breaded Chicken with capacity to slaughter 50.000 birds/day.
PDF Quality Control Laboratory for Food Industries with an area of 300 m².
Plant and layout Factory to Produce Extruded Fodder for Fishes, Cats and Dogs with capacity for 500 Kg/day.
Project Factory to Produce Banana Powder (Banana Flour) with capacity for 50.000 Kg/day.
Project Clothing Industry to Produce Jeans Pants with capacity for 100 garments/day.
FeasibilityIndustry to Produce Body Soap with an area of 400 m² and capacity for 10.000 kg/day.
Business plant Factory to Produce Powder Cheese Bread with capacity for 500 Kg/day.
Project Slaughterhouse Ovines with capacity to slaughter 75 animals/day.
How to start Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 50.000 liters/day.

Project - how to start Tannery Frog Skin with capacity to Produce 750 skins/day.