Ready project Tannery Frog Skin with capacity to Produce 750 skins/day.

CODE - CTM-045

Ready project Tannery Frog Skin with capacity to Produce 750 skins/day.

CODE - CTM-045


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 750 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Frog Skin Tannery | Tanning with Frog Skins | Frog Skin Tannery | Frog Tanning | Deodorant Production | Computer Store Projects | How to Set Up a Nautical Equipment Store | Gas Station Model In DWG | Juice Bar Research Spreadsheet Template | Disposable Products Store Template | Embroidery Machine Business Plan | Fruit Jelly Factory | How to Assemble a Small Beverage Tank | I want to set up a scrapyard | Project Template for Computer Science Classes for Senior Citizens | 1000 Birds Slaughter Project | Society Football Court Project | Rx Room Projects | Office Plans Projects and Floor Plans Various | Companies That Design Industrial Kitchens | Organizational Design of a Spa | Pizzeria Utensils How to Assemble | Retirement Home Floor Plan | How to Set Up a Massage Room | Machine Model for Manufacturing Physiological Serum | I want to open a marble shop. What do I need? | T-Shirt Prints for Construction Material Warehouse | Curtains for Production | Soles Factory Production Flow | Sign Design Template | Skewers Factory | Shopping Bathroom Drawing.dwg | Setting Up a Block Company | Stove Production | Brick Machine, Pottery | Wire Sieve Manufacturing | Macroscopy Room Projects | Yogurt Distributor Petropolis | laundry business plan template | Layouts De Oficina Moto | Skate Park Setup Program | I Need A Pop Pharmacy Set Up | Ppho Flowchart | Sewing Plant Template | Setting Up a Security Center | Fire Prevention Project LPG Distributor | Air Conditioning Installation Project Sample In Dwg | How to Set Up Radio Taxi Companies | How to Open an Organic Fertilizer Factory | Tile Production Project | French Bread Production Budget | Layout For Orange Juice | Plastic Greenhouse for Mushroom Production | Granola Factory | Ointment Production Flowchart |

 

Other projects ready:

How to start Tanning Ostrich Skin with capacity to Produce 300 Skins per day.
Project Factory to Produce Concentrated Fruit Pulp with capacity for 1.000 Kg/day.
PDF Factory to Produce Confecção with capacity for Production de 50 Kg/day.
Plant and layout Clothing Industry to Produce Dyeing Fabric (Hippie Clothes) with capacity for 500 garments/day.
Project Factory to Produce Mushroom Shiitake with capacity for 500 Kg per day.
Project Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 500 animals/day.
FeasibilityFactory to Recycle Trash with capacity for 7.000 Kg/day.
Business plant Industrial Kitchen without Restaurant with capacity for 300 meals per day.
Project Factory to Produce Plastic Bags with capacity for 10.000 Kg/day.
How to start Factory of Crystallized Orange Candy with an area of 250 m² (299sq.yd.) and capacity for 2.000 kg/day.

Project - how to start Tannery Frog Skin with capacity to Produce 750 skins/day.