Ready project Tanning Cattle Hides with capacity for 2.000 Hides/day.

CODE - CTM-015

Ready project Tanning Cattle Hides with capacity for 2.000 Hides/day.

CODE - CTM-015


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Cattle Hides

How to start Tanning Cattle Hides with capacity for 2.000 Hides/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Cattle Hides

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

What Does Ribeira Plant Mean In Cattle Leather Tannery Project | How to Assemble an Auto Part | Container Stores | Vehicle Dealership Organizational Chart Template | Chocolate Shop Payment Flowchart | Photos of Jewelry Store Facades | Pop Crunchy Peanut Candy Factory | Layoutdrugstore | What You Need to Open a Music School | Basic Poultry Slaughter Flowchart | Meat House Open Business | Stadium Plans | Floor Plan of 2 Surgical Center | Pop Physiotherapy Model | Price Per Kg Hospital Autoclave Waste | Children's Buffet Model Floor Plan | Set Up a Draft Beer Bar | How to Open a Ballroom Dance School | How Much Does It Cost to Set Up a Bowling Alley? | Car Wash Legislation | A Lacarte Restaurant Project | Water Analysis Laboratory Assembly Consultant | I Want to Start a Handmade Soap Company | Set Up Suit Factory | Layout Manufacturing | How to Assemble Disposable Cups Industry | Plastic Recycling Plant Layout | MDF Toy | Precast Concrete Business Plan | Drywall Production Company | Flowchart of a Packaging Industry | Set up a PCB Factory | Dairy Plant | Mineral Water Budget Templates | How to Start a Battery Business | Pop Business Model | Pop For Lab Ready | Bamboo Crafts Flowchart | Billboard Budget Template | Can You Make a Print Run of 10 Books? | Facade of a simple event office | Factory Blueprint Templates | Cold Room for Frozen Pizza | Wine Production Equipment Bottle Sanitization | How to Set Up a Pre-cooked Potato Industry | Cocoa Processing Plant | Cachaça Distillery Project Budget | How to Set Up a Pet Cemetery |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
Project Factory Milk Powder Reconstitution with capacity for 3.000 liters/day.
PDF Factory for Maize Flour production with capacity of 2.000 kg/day and 150 m² (179,4 sq.yd.) area.
Plant and layout Drugstore with an area of 50 m².
Project Factory to Produce Injected Plastic with capacity for 13.000 Kg/day.
Project Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 10.000 Units per day.
FeasibilitySlaughterhouse Cold Meat and Crackling (Torresmo) Production, with an area of 150 m2, with capacity to produce 2.000 Kg/day.
Business plant Clothing Industry to Produce Caps with capacity for 1.000 garments/day.
Project Factory to Produce Banana Powder (Banana Flour), Banana Raisin, Banana Raisin with Chocolate Covering, Banana Sweet, Banana Purée with capacity for 100.000 Kg/day.
How to start Slaughterhouse for Frozen Fish, Fish Products and Breaded Fish Production, with an area of 400 m2 (SIF), and capacity for 10.000 kg/day.

Project - how to start Tanning Cattle Hides with capacity for 2.000 Hides/day.