Ready project Tanning Cattle Hides with capacity for 750 Hides/day.

CODE - CTM-013

Ready project Tanning Cattle Hides with capacity for 750 Hides/day.

CODE - CTM-013


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Cattle Hides

How to start Tanning Cattle Hides with capacity for 750 Hides/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Cattle Hides

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Finance of a Tannery | Ready-made tannery work | Tannery Project -technical engineering -ready projects -snake -fish | Ready Work on Tanning | Tannery Factory Set Up | Ready-made Works on Tannery | Soap Flowchart Template | Cell Phone Store Names | Automotive Battery Business Plan | Newsstand Site Plan | How to Open a Japanese Products Store | Party Supplies Store Project | Clothing Store Design | Projects for the Production of Milk Sweets | Pharmacy Facades | Memorial Slaughterhouse Effluent Treatment Plant | What is the investment to set up a refrigerator? | Shark Cartilage How to Produce | Football Court Financing Project | How to Set Up an Acupuncture Clinic | Physiotherapy Clinic Floor Plan | DWG Bodybuilding Academy Project | Beer House Plant | Theme Park Project Template | Setting Up A Bowling Alley | Concrete Car Wash Ramp | Production Flowchart of a Toy Company | Setting Up a Sewing Factory How Much to Invest | Packaging Production Flowchart | Construction Model for Clothing Factories | Material for Making Brushes | Precast Layout | Electronic Gate Project Flowchart | Paper Bag Factory Mg | Fridge Magnet Factory | Milk Cold Room | Assemble Small Motorhome | Popular House Plans With Three Bedrooms | How to Make Drugstore Pop | POP Template for Pest Control Companies | View Transport Budget Template | View Restaurant Construction Model | Computer Technical Assistance Layout | Setting Up a Jewelry Studio | Stand Models for Fairs | How to Keep Frogs Safe | Ice Cream Packaging | Cheese Bread Factory Project | Office Assembly Budget.xls | Caramel Popcorn Factory | Vetiver Essential Oil Producer In Brazil | I Want to Set Up a Crematorium |

 

Other projects ready:

How to start Slaughterhouse for Bovines Slaughter and Charque Producing with capacity for 600 animals/day.
Project Clothing Industry to Produce Leather Clothes with capacity for 200 garments/day.
PDF Factory to Produce Toothpick with capacity for 300 Kg/day.
Plant and layout Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 10 and 20 liters.
Project Factory to Produce Raisins Cashew Nuts, Cashew Syrup, Crystallized Cashew, Cashew Jelly and Toasted Cashew Nut with capacity for 500 Kg per day.
Project Factory to Produce Biomass of Banana with capacity for 3.000 Kg per day.
FeasibilityHospital Waste Incinerator with capacity for 10.000 Kg/day.
Business plant Slaughterhouse Ovines with capacity to slaughter 300 animals/day.
Project Factory to Produce Banana Flour, Banana Sweet, Banana Purée and Biomass of Banana with capacity for 5.000 Kg per day.
How to start Factory to Produce Injected Plastic with capacity for 3.000 Kg/day.

Project - how to start Tanning Cattle Hides with capacity for 750 Hides/day.