Ready project Tanning Ostrich Skin with capacity to Produce 500 Skins per day.

CODE - CTM-019

Ready project Tanning Ostrich Skin with capacity to Produce 500 Skins per day.

CODE - CTM-019


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ostrich Skin

How to start Tanning Ostrich Skin with capacity to Produce 500 Skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ostrich Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Layout or Physical Arrangement of a Mineral Water Company | How to Set Up a Physical Layout Project | Physical Arrangement Layout of a Ceramics Factory | Goat Shed | Set Up Tire Store | I Want to Set Up a Rotisserie, It's a Good Business | How Do I Set Up a Plaster Distributor? | Children's Daycare Project | Power Distribution Plant | Equipment for Food Basket Companies | Driving School Floor Plan | Refrigerator Project Dwg | Flour and Oil Factory Equipment | Sports Court In DWG | Office Plan | Physical Plan Drawing of a Basic Health Unit | Buffet Company Project | Hostel Project In Cad | Industrial Hospital Kitchen Floor Plan | How to Create a Nightclub Presentation Project | Layout Para Lavajato | Floor Plan for Children's Party Room | Plaster Bandage Manufacturers | Foam Making Machines | Organizational Chart of a Clothing Factory | Drugstore Uniform Models | Nonwoven Bag Factories | Styrofoam Tray Industries | School Desk Design | Install Wooden Window | Making Concrete Moorings | Cardboard Box Production | Parts for Assembling Aluminum Windows | How to Set Up a Fireworks Company | What is needed to set up a prosthetics laboratory? | Yogurt Packaging Industry | Good Practices Manual for Pest Control | Mount Armored Machine | Wastewater Treatment Standard Operating Procedure | Pop Template Standard Operating Procedure Services | Build Beauty Salon | How to Set Up a Domestic Helper Business | How to Open a Parking Lot Rental Company | How to Open a Representation in Brazil | Cleaning Company Name | How to Set Up a Recording Room | Pig Facilities | Physical Arrangement Cake | Cream Cracker Cookie Machine | Eucalyptus Distillery Cost | Open an Acai Business | Hot Sauce Making Machine | Pet Shop Design |

 

Other projects ready:

How to start Center of Plagues and Insects Control with an area of 100 m2.
Project Industry to Produce Creams, Hair Conditioner, Hand and Body Cream, Suntan Lotion with capacity for 500 Kg/day.
PDF Cinema (Exibition Room) with capacity for 700 people (3 rooms) .
Plant and layout Farm with Caprine Houses for 300 animals (Breeding and Milking), Milk and Dairy Industry to Produce Cheese, Slaughterhouse for 30 animals per day and Tannery for Goatskin.
Project Clothing Industry to Produce Heavy Fabrics (Canvas) with capacity for 200 garments/day.
Project Factory to Produce Humid handkerchiefs with capacity for 1.000 units per day.
FeasibilityPoultry House with capacity for 15.000 Broiler Chickens.
Business plant Clothing Industry to Produce Caps with capacity for 500 garments/day.
Project Factory to Produce Organic Cachaça (Liquor) with capacity for 300 liters/day.
How to start Factory to Produce Chocolate type Merengue, with capacity for 1.000 Kg/day.

Project - how to start Tanning Ostrich Skin with capacity to Produce 500 Skins per day.