Ready project Tanning Rabbit Skin with capacity to Produce 1.000 Skins/day.

CODE - CTM-054

Ready project Tanning Rabbit Skin with capacity to Produce 1.000 Skins/day.

CODE - CTM-054


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Rabbit Skin

How to start Tanning Rabbit Skin with capacity to Produce 1.000 Skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Rabbit Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Rabbit Tanning | How to Make Rabbit Food | Tanning Rabbit Skin | Floor Plan Of Cosmetics Factory | Open a Photo Development Company | Setting Up a Tire Distributorship | MDF M2 | Rotisserie Model | How to Set Up a Gerso Company | How to Set Up a Thrift Store | Floor Plan Or Layout Of A Medicine Distributor | List of Names for Basic Food Basket Company | Driving School Plans | Sanitary Slaughter Project | Fishmeal Manufacturing Flowchart | Development of a Multi-Sports Gymnasium | Medical Office Plans | Organizational Chart of a Basic Healthcare Unit | Physical Layout of the Emergency Room | How Much Does a Buffet Cost for 400 People? | What is an organizational chart for a guest house? | Hospital Kitchen Floor Plan | How to Set Up a Nightclub | Car Wash Loyalty | Children's Buffet Floor Plan | Machine for Making Plaster Bandages | Organizational Chart Of A Mattress Factory Work | Set up Uniform Factory | Bag Production Flowchart | Styrofoam Tray Line | What is the raw material of school desks? | Business Plan Frames | Wire Fence with Concrete Post | How to Open a Box Factory | Plan to assemble aluminum window | How to Assemble Fire Galvanizing | What You Need to Set Up a Prosthetics Laboratory | Yogurt Packaging | Pest Control Company Good Practices Manual | Floor Plan of a Ready-Made Armored Workshop | Popc2b4s Manual Standard Operating Procedures In Hotel | Pops Template for Food Businesses | Schedule2c Beauty Salon | Domestic Worker Training Model | How to Set Up a Van Rental Company | Financing for Representation Company | General Cleaning Business Plan | Recording Studio Constructions | Maternity Unit with Bunk Bed | How to Start a Cake and Sweets Business | Cream Cracker Making Machine | Eucalyptus Oil Distiller | Acai Production Chain - Flowchart | Pepper Grinder Machine | Online Pet Shop Project |

 

Other projects ready:

How to start Marble and Granite Factories to Produce Cutted Stones with capacity for 1 Block per Week.
Project Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 500 garments/day.
PDF Poultry House with capacity for 2.000 Broiler Breeders and Built area of 700 m² (to Produce Commercial Eggs).
Plant and layout Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 10 and 20 liters.
Project Slaughterhouse Ovines with capacity to slaughter 20 animals/day.
Project Clothing Industry to Produce Caps with capacity for 200 garments/day.
FeasibilityFactory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 5.000 Kg/day.
Business plant Cold Storage Room to Process ALIVE and Stunned Shrimps with capacity to Produce 1.000 Kg/day.
Project Factory to Produce Sausages (with Carcass Reception) with capacity for 5.000 Kg/day.
How to start Factory to Produce Banana Purée with capacity for 30.000 Kg/day.

Project - how to start Tanning Rabbit Skin with capacity to Produce 1.000 Skins/day.