Ready project Tanning Rabbit Skin with capacity to Produce 300 Skins/day.

CODE - CTM-051

Ready project Tanning Rabbit Skin with capacity to Produce 300 Skins/day.

CODE - CTM-051


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Rabbit Skin

How to start Tanning Rabbit Skin with capacity to Produce 300 Skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Rabbit Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Work on Tannery Production | Warehouse Budget Template | Set up a Cosmetic Factory | Goat Plants Rural Projects | How to Set Up a Pet Food House | Motorcycle Parts Store Projects | Chicken Sale Project | Fishmonger Suppliers | Business Plan for Blinds | Children's Clothing Store Business Plan | Distribution of Basic Food Basket Company | Ready-made Social Project Template | Newborn Calf For Sale | Frozen Snacks Table | Documentation Required to Open a Slaughterhouse | Setting Up a Company Layout | Psf Health Projects | What Do I Need to Set Up an Ambulance Company? | Gym Building Plan | Economic Viability Project for Inn | School Kitchen Project | Nightclub Design | Physical Layout of a Car Wash | Equipment for Art Gallery | Machines for Tablet Production | Retreading Machines | Basic Layout of a Lingerie Factory | I want to open a tow factory | Mini Soft Drink Maker Machine | Bnds Machines for Making Mirrors | Project to Set Up a Carpentry Company | Kayak Factory | Prefabricated Fireplace How to Assemble | Paper Manufacturing Model | Anodizing Equipment | How to Plan a Machining Shop | Dental Prosthesis Laboratory Price List | Milk Powder Production Plant | To Start a Factory What to Do First in GMP | What Equipment Do I Need to Open a Tire Shop? | Smoked Eggs | Construction Procedures Manual | Floor Plans Photo Studio | Setting Up a Manicure and Pedicure Room | How Much Do I Need to Open a Car Dealership? | Accounting Office Floor Plan In 3D | I Want to Set Up a Fire Extinguisher Maintenance Company | Hot Dog Kiosk for Sale | Bnds Financing for Pig Farm | Cereal Bar Business Plan | Maontar Sandwich Maker Natural Model | Representation of Peppers | I Want to Build a Grain Silo | Firm Dog Bone |

 

Other projects ready:

How to start Factory to Produce Ketchup with capacity for 20.000 Kg per day.
Project Cold Storage Room to Produce Salted and Smoked Fishes and Fish Products with capacity for 20.000 Kg/day.
PDF Factory Milk Powder Reconstitution with capacity for 500 liters/day.
Plant and layout Industrial Kitchen without Restaurant with capacity for 100 meals per day.
Project Factory to Produce Meat Spread (Pâté) with capacity for 10.000 Kg/day.
Project Biodigestors for Small Properties with capacity for 5 m3 of gas per day.
FeasibilityBuffet with capacity for 1.000 people.
Business plant Factory to Produce Soy Cheese (Tofu) with capacity for 5.000 Kg per day.
Project Factory to Produce Dehydrated Fruits (Raisin Banana, Raisin Grape, Prune, Dry Peach and others) with capacity for 1.000 Kg per day.
How to start Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 10 and 20 liters.

Project - how to start Tanning Rabbit Skin with capacity to Produce 300 Skins/day.