Ready project Factory to Produce Lollipop with capacity for 5.000 Kg/day.

CODE - DC-011

Ready project Factory to Produce Lollipop with capacity for 5.000 Kg/day.

CODE - DC-011


Project ready with:

Industry with the following sections:
Reception Platform for Raw Material and Ingredients
Storage for Raw Material
Storage for Ingredients
Manufacture Room
Packaging Room
Storage for Finished Products
Storage for Cleaning Material
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Lollipop

How to start Factory to Produce Lollipop with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Lollipop

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Start a Lollipop Business | Technological Advances in Soap Making | Mini Market Set Up | How to set up a store and rent | How to Set Up Your Dental Products Distributorship | I Want to Open a Deli | Baby Store Layout | Drawing of a Homeopathic Pharmacy | Food Project Example | Computer Equipment Table | How to Open a Refrigerator | Plant for rendering | Floor Plan Of A Multi-Sports Court DWG | Medical Clinic Plant | Physical Plan of the Basic Health Unit | ICU Room Design Template | Techniques for Setting Up a Coffee Shop | How to Assemble a Supermarket Leauti | Cleaning and Maintenance Project for the Experimental Kitchen | Car Wash Design | Projects for a party hall for 500 people | Legislation for Production of Cphd | Mechanic's Paste Factory | T-Shirt Production Process | Flowchart of a Shirt Factory | What Is It Like To Work In The Broom Industry? | Animal Drinking Fountains Manufacturer | Coal Factory | Asphalt Plant Feasibility | Cardboard Tube Factory | Flowchart for Obtaining Cast Iron | Motorcycle Exhaust Manufacturing | How to Open a Veterinary Clinical Analysis Laboratory | Dairy Model | Water Bottling Feasibility Study | How to Set Up a Car Parking Project | Standard Operating Standard Ready | How to Make Operating Standard | Beauty Salon Floor Plans Templates | Organic Garden Projects With Greenhouse | How to Set Up a Vehicle Tracking Company | Ready-made Project for Human Resources Company | How to Set Up a Refrigeration Company | Filming Project | Popsicle Manufacturing Process | How to Start a Small Pasta Business | Biscuit Packaging Models Tapioca Flour | Pulp Juice Factory | Tomato Extract Health | How to Start a Pet Shampoo Factory |

 

Other projects ready:

How to start Clothing Industry to Produce Women's Clothing (Party Clothes) with capacity for 500 garments/day.
Project Factory to Produce Corn Flour, Corn Flakes and Corn for Canjica with capacity for 3.000 Kg per day.
PDF Factory to Produce Cashew Jelly with capacity for 3.000 Kg per day.
Plant and layout Animals Hotel with capacity for 10 animals.
Project Factory to Produce Grain Alcohol (Rice and Corn) with capacity for 3.000 liters/day.
Project Wine Factory with capacity for 100.000 liters/year and area of 400 m².
FeasibilityIndustry Mineral Water Bottling with capacity for 40.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
Business plant Factory Milk Powder Packing (with Mixture) with capacity for 13.000 Kg/day.
Project Factory to Produce Frozen Pre-Fried Cassava and Stick Cassava (Manioc) with capacity for 500 Kg per day.
How to start Factory to Produce Wine and Sparkling Wine, with capacity for 100.000 liters/year.

Project - how to start Factory to Produce Lollipop with capacity for 5.000 Kg/day.