Ready project Tanning Rabbit Skin with capacity to Produce 750 Skins/day.

CODE - CTM-053

Ready project Tanning Rabbit Skin with capacity to Produce 750 Skins/day.

CODE - CTM-053


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Rabbit Skin

How to start Tanning Rabbit Skin with capacity to Produce 750 Skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Rabbit Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up a Tannery for Rabbit Skins | Sporting Goods Store Design Template | How Should I Create a Car Rental Flowchart? | I Want to Open a Dealership | Chocolate Shop Layout | Physical Arrangement of a Computer Company | Jewelry Store Design | Tannery Equipment | Drugstore Physical Design Model | How to Set Up a Music School | Equine Slaughter Flowchart | How to Set Up a Hamburger Factory | Football Stadiums Dwg | Surgical Center Utility Room | Physiotherapy Office - Construction Project | Air Intensive Care Unit | Floor Plan Of A Guest House With Barbecue | Hypermarket Projects | Equipment for Setting Up a Yoga Room | Bowling Alley Budget | How to Set Up an Environmental Project for a Washing Machine | Marketing Plan for a Lunch Box Company | I Want to Set Up a Pen Factory | Vegetable Sponge Industry | What Do I Need to Learn to Set Up a Clothing Company? | Clothing Industries Newborns | How I Started a Disposable Cup Business | Plastic Wood Production | MDF Parts In Poços De Caldas | Concrete Block Profitability | Concrete Plant Factory Layout | Cardboard Box Project | Machines for Producing Aluminum Pans | Balcony Coverings | Credit for Financing a Photographic Laboratory | Dairy Industry Business Plan | Selling Ice Factory | Raw Materials for Assembling Battery | Pharmacy Standard Operating Procedure Manual Template | Pop Cleaning Material | Floor Plan of a Freight Forwarding Company | I Want to Set Up a Plant Nursery | Container Manufacturing Projects | Investment for a Fast Graphics | Floor Plan Chronotachograph | Fruit Popsicle Production | Pizza Oven Dwg | Sparkling Wine Flowchart | Work Plans in Production | Making Soy Meat | Cemetery Drawer Project |

 

Other projects ready:

How to start Bakery to Produce Dog Products (Panetoni, Cookie, Cracker, etc) with an area of 50 m2.
Project Sterilization Unit (by Low Temperature Steam and Formaldehyde) with capacity for 50.000 Units per day.
PDF Gymnasium with capacity for 100 alunos per day.
Plant and layout Factory to Produce Organic Cachaça (Liquor) with capacity for 10.000 liters/day.
Project Factory Glass Recycling with capacity for 1.000 Kg/day.
Project Factory to Produce Baked and Frozen Cheese Bread, with an area of 360 m² and capacity for 3.000 kg/day. The cheesemaking cames with the Cheese Bread Factory.
FeasibilityClothing Industry to Produce Caps with capacity for 1.000 garments/day.
Business plant Sterilization Unit (by Ethylene Oxide) with capacity for 25.000 Units per day.
Project Auditorium and Convention Center with capacity for 500 people.
How to start Factory to Produce Alcohol Gel with capacity for 3.000 liters/day.

Project - how to start Tanning Rabbit Skin with capacity to Produce 750 Skins/day.