Ready project Comercial Laundry with capacity for 30 kg of Clothes per day.

CODE - LV-010

Ready project Comercial Laundry with capacity for 30 kg of Clothes per day.

CODE - LV-010


Project ready with:

Laundry with the following sections:

Reception
Packaging
Weighing
Classification
Washing
Sanitary Barrier
Drying
Ironing
Separation
Folding
Sewing
Distribution
Storage
Storage for Cleaning Material
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Comercial Laundry

How to start Comercial Laundry with capacity for 30 kg of Clothes per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Comercial Laundry

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Laundry Facades | Business Plan (service) | Small Laundry Models | Commercial Laundry .dwg | Planning to Set Up Laundry | How to Set Up a Small Laundry Room | Commercial Laundry Legislation | Commercial Laundry Facade | Commercial Project Template for Financing | Commercial Laundry Floor Plan | Small Commercial Laundry Room Plans | Laundry Model Project | Ready Commercial Project | .clothes laundry template | Commercial and Industrial Laundry Project | Consulting for Setting Up a Laundry | Commercial Laundry Legislation | Laundry Project Financing | Commercial Laundry Project | Commercial Laundries Assembly | Commercial laundry project | Memorial Commercial Laundry Project | Ready Business Project | Commercial Laundry Models | Laundry Facade | Laundry Facade | Laundry Facade Project | Commercial Laundry Factory | Ready-Made Business Plan Project | Commercial Laundry Business Plan | Financial Laundries | Tips on How to Set Up a Laundry Room | Consulting on Setting Up a Laundry | Laundry Projects | How to Set Up a Commercial Laundry | How to Open a Commercial Laundromat | Laundry Facade | Commercial Laundry Legislation for Opening | I Need to Set Up a Commercial Laundry | Laundry Setup Consulting | Laundry Facades | Laundry Assembly | Ready Laundry Business Plan | Facades2Commercial laundry | Bndes Laundry | Consulting for Setting Up a Laundry | Laundry Business Idea | Business Plan2c Opening a Laundromat | Commercial Laundry Floor Plan | Commercial Laundry Plants | Cachaça Production Layout | Ways to Stock Up on Cleaning Products | Set Up Screw Shop | How to Open an Oil Change Shop | How to Set Up a Roast Shop | How to Set Up a Fish Market in Bahia | How to Manage an Air Conditioning Store | Women's Clothing Store Business Plan Flowchart | How to Make a Distribution Project | Nurseries for Babies - Floor Plan | Built-in Greenhouse Project | Chicken Broth Factory | I Want to Start a Shrimp Business | Cme Sterilization Machines | Slide Design Of A Polyclinic With Drawing | Ambulance Where to Ride | Project Script for an Academy for the BNDES | Pay-to-Fish Plant | What is the 1c2ba Step to Opening a Marmitex Supply Business? | Bar Layout Templates | Open Snack Bar | Physical Financial Schedule for Residential Construction | Laboratory Reception Projects | What Do I Need to Set Up a Paint Lab? | Underwear Production Cost Table | Projects to Set Up a Ball Factory | Industries Machines for PVC Lining | How to Set Up a Styrofoam Company | Broom Manufacturing Flow Chart | Matchstick Manufacturing | Mortar Manufacturing Flowchart in Brazil | Egg Box Raw Material | Manual for Metalworking Area | How to Make Plastic Parts | Environmental Laboratory Assembly | How Much Does It Cost To Open A Cheese Shop | Good Practices Manual Template for Cosmetics Distributors | How I Opened a Tire Shop | How to Smoke Quail Eggs | Pop Hospital Cleaning Service | Gas Resale Plant | Barber Shop Equipment | How to Set Up a Representation Office | Accounting Office Flowchart | How to Start a Watch Business | Surveillance Services Business Plan | Construction of Pig Sheds | How to Set Up a Garlic Bread Factory | Instant Coffee Processing Flowchart | Industrialization of Oats | Flowchart for Powdered Juice Production | Hotel Floor Plan and Project |

 

Other projects ready:

How to start Factory to Recycle Plastic with capacity for 10.000 Kg/day.
Project Emergency Room (Basic Health Unit), with a built area of 600 m².
PDF Tanning Ostrich Skin with capacity to Produce 1.000 Skins per day.
Plant and layout Factory to Produce Chicken and Meat Stock Tablet with capacity for 5.000 Kg/day.
Project Swine Farm (with Overlapping Bed) with capacity to Produce 560 Matrix.
Project Factory to Produce Wood Briquette with capacity for 5.000 Kg/day.
FeasibilityFactory to Produce Lollipop with capacity for 3.000 Kg/day.
Business plant Cachaça (Liquor) Factory, with an area of 150 m² and capacity for 200 liters/day. (To be built in a different level land).
Project Cold Storage Room to Process Stunned Shrimps (from Marine Fisheries) with capacity to Produce 5.000 Kg/day.
How to start Slaughterhouse Caprines with capacity to Slaughter 300 animals/day.

Project - how to start Comercial Laundry with capacity for 30 kg of Clothes per day.