Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Day Care with capacity for 50 children.
CODE - ESC-007
Ready project Day Care with capacity for 50 children.
CODE - ESC-007
Project ready with:
Day Care with the following sections:
Reception
Rooms
Pharmacy
Admission Office
Social Worker
Canteen
Storeroom
Kitchen
Pantry
Women's Bathrooms
Men's Bathrooms
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Day Care
OPTIONAL SERVICES:
Financial Feasibility Study of Day Care with capacity for 50 children.
Business plan for Day Care with capacity for 50 children.
3D project of Day Care with capacity for 50 children.
Projects with other capacities
Day Care
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Nursery Floor Plan
|
Nursery for 50 Children
|
Budget for setting up a nursery for 50 children
|
What is the capacity of children in the nursery?
|
Projects to Apply in Nursery Class
|
Nursery Floor Plan
|
How to Set Up a Nursery
|
Build Nursery for 5th Grade Children
|
Nursery Work Plan
|
Ready Projects Nursery I
|
Nursery Floor Plan
|
Budget to Build a Chocolate Business
|
Cotton Swab Factory Use
|
Flowchart How to Make an Electrical Materials Store
|
Images Of How To Set Up An Oil Change Shop
|
Sebrae Antennas Store
|
How to Create a Business Plan for the Pamonha Industry
|
Multi-Things Poços De Caldas
|
How to Set Up a Small Bed, Table and Bath Store
|
Example of a Candy Company Project
|
I want to set up a small beverage distributor. What do I need?
|
Tire Recycling Plant Project
|
How to Open a Painting School
|
Cold Room for Beer
|
Projects on the Flow of a Beef Deboning Room
|
Ready Investment Projects
|
Dental Documentation Institute C3b4nica Plant
|
Dental Clinics Plants
|
Motel Floor Plan Model
|
Movie Theater Flowchart
|
Cafeteria Projects
|
Gas Station Floor Plan Templates
|
Coco Express Price List
|
Physical Plant Layout
|
Diaper Business Plan Template
|
View a Model Floor Plan of a Paper Mill
|
Fco Clothing Business Plan
|
Baby Bag Factory
|
Business Plan for a Slipper Factory
|
Plastic Hair Clip Factory
|
Wooden Clothes Peg Factory
|
Pool Table Process
|
Precast Plant
|
Satellite Dish Design
|
Sand Production
|
Selling Chair Manufacturing Company
|
Setting up in a clinical analysis laboratory
|
Minas Cheese Schedule
|
Car Wash Production Flowchart
|
Mechanical Workshop Projects
|
Medicine Traceability Pop Template
|
How to Build a Rodeo Arena
|
Setting Up a CFC
|
Pest Control Company Plant
|
Office Business Plan
|
Commercial Projects with Mobile Cars
|
Organizational Chart of an Equipment Leasing Company
|
Ecological Brick Distributor
|
Project Template for Sweet and Savory Courses
|
Cookie Plant Layout
|
How to Set Up a Dry Spice Factory
|
Veterinary Office Floor Plan
|
Other projects ready:
How to start Factory to Produce Organic Cachaça (Liquor) with capacity for 10.000 liters/day.
Project Factory to Produce Perfume with capacity for 1.000 liters/day.
PDF Factory to Produce Liquid Chocolate with capacity for 20.000 liters por day.
Plant and layout Factory to Produce Water Rakes with capacity for 30.000 units per day.
Project Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 10.000 liters/day.
Project Milk and Dairy Industry for Parmesan Cheese production, with 600 m2 (717,6 sq.yd.) area and production capacity for 10.000 liters per day.
FeasibilityLottery Agency with an area of 15 m2.
Business plant Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups with a machine to make PET Bottles.
Project Factory to Produce Pepper Paste with capacity for 5.000 Kg per day.
How to start Slaughterhouse for bovines slaughter and Charque - 50 animals/day - area of 700 m² (837,2 sq.yd).
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US