Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Egg Sorters with capacity for 5.000 Eggs/day.
CODE - AVE-083
Ready project Egg Sorters with capacity for 5.000 Eggs/day.
CODE - AVE-083
Project ready with:
Construction with the following sections:
Farm to Produce Eggs
Egg Selecting
Egg Reception
Cleaning
Selection
Package
Storage
Expedition
Canteen
Dressing Room
Office
Fodder Factory
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Egg Sorters
OPTIONAL SERVICES:
Financial Feasibility Study of Egg Sorters with capacity for 5.000 Eggs/day.
Business plan for Egg Sorters with capacity for 5.000 Eggs/day.
3D project of Egg Sorters with capacity for 5.000 Eggs/day.
Projects with other capacities
Egg Sorters
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Egg Sorter Project
|
Cosmetics Factory Floor Plan
|
Complete Dairy Goat Breeding Project Model
|
How to Set Up a Photo Printing Shop
|
Tire Shop Floor Plan
|
Machinery Needed to Open a Rotisserie
|
Plasterboard Company Assemble
|
Brechc3b4s Names For Kids
|
Open a Medicine Distributor in Minas Gerais
|
Setting Up a Christmas Basket Business
|
Driving School Business Plan
|
Cost to assemble a refrigerator
|
Swine Slaughter Equipment
|
Sports Gym Model
|
How to Open a Medical Consulting Clinic
|
Ubs Flowchart
|
What Equipment Do I Need to Set Up an Emergency Room?
|
Equipment for Setting Up a Buffet
|
How to Set Up a Restaurant Project for BNDES
|
How to Set Up a Frozen Food Kitchen
|
Materials for setting up a car wash
|
Party Room Plan In 3d
|
Serpentarium Supplier
|
How to Open a Spring Mattress
|
Organizational Chart for Clothing Manufacturing
|
Business Plan3a Uniform Manufacturing
|
Nonwoven Bag Factory Machines
|
Machine for Making Styrofoam Trays
|
How to Start a Cavaf4 Company
|
Study of frames
|
How to Make Concrete Posts
|
Loan to Open Cardboard Box Factory
|
Aluminum Frame Business Plan
|
Hot Galvanizing For Sale
|
Floor Plan of a Dental Prosthesis Laboratory
|
Ice Cream Shop Floor Plan
|
Ready-made Company Project
|
Ready-Made Work on How to Set Up and Maintain a Bicycle Shop
|
Standard Operating Procedure for Food
|
Restaurant Project Template
|
Hairdresser Flowchart
|
I opened a funeral home
|
Step by Step Guide to Setting Up a Van Rental Company
|
How to Create a Business Plan Representation
|
Car Dry Wash Supplier
|
List of Materials for Setting Up a Recording Studio
|
Plant Models for Pig Farm
|
Industrial Cake Production
|
Eucalyptus Oil Flowchart
|
How to Set Up an Acai Factory
|
Hot Sauce Manufacturers
|
Pet Shop Reception Projects
|
Other projects ready:
How to start Factory to Produce Vinegar made from Cane Bagasse with capacity for 300 liters/day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 10 Blocks per Week.
PDF Industry to Produce Soap with capacity for 3.000 Kg/day.
Plant and layout Factory to Produce in natura Potato with capacity for 20.000 Kg per day (Potato Washer).
Project Comercial Laundry with capacity for 100 kg of Clothes per day.
Project Factory to Produce Pasteurized Liquid Egg with capacity for 500 liters/day.
FeasibilityIndustry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters and plastic cups.
Business plant Tannery for Wet Blue until Finishing Plant, with capacity for 100 leathers/day.
Project Factory to Produce Meat Spread (Pâté) with capacity for 100 Kg/day.
How to start Slaughterhouse for bovines slaughter and Charque - 75 animals/day - area of 1.000 m² (1196 sq.yd).
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US