Ready project Egg Sorters with capacity for 5.000 Eggs/day.
CODE - AVE-083
Ready project Egg Sorters with capacity for 5.000 Eggs/day.
CODE - AVE-083Project ready with:
Construction with the following sections:Farm to Produce Eggs
Egg Selecting
Egg Reception
Cleaning
Selection
Package
Storage
Expedition
Canteen
Dressing Room
Office
Fodder Factory
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Egg Sorters
OPTIONAL SERVICES:
- Financial Feasibility Study of Egg Sorters with capacity for 5.000 Eggs/day.
- Business plan for Egg Sorters with capacity for 5.000 Eggs/day.
- 3D project of Egg Sorters with capacity for 5.000 Eggs/day.
Projects with other capacities
Egg Sorters
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Egg Sorter Project | Cosmetics Factory Floor Plan | Complete Dairy Goat Breeding Project Model | How to Set Up a Photo Printing Shop | Tire Shop Floor Plan | Machinery Needed to Open a Rotisserie | Plasterboard Company Assemble | Brechc3b4s Names For Kids | Open a Medicine Distributor in Minas Gerais | Setting Up a Christmas Basket Business | Driving School Business Plan | Cost to assemble a refrigerator | Swine Slaughter Equipment | Sports Gym Model | How to Open a Medical Consulting Clinic | Ubs Flowchart | What Equipment Do I Need to Set Up an Emergency Room? | Equipment for Setting Up a Buffet | How to Set Up a Restaurant Project for BNDES | How to Set Up a Frozen Food Kitchen | Materials for setting up a car wash | Party Room Plan In 3d | Serpentarium Supplier | How to Open a Spring Mattress | Organizational Chart for Clothing Manufacturing | Business Plan3a Uniform Manufacturing | Nonwoven Bag Factory Machines | Machine for Making Styrofoam Trays | How to Start a Cavaf4 Company | Study of frames | How to Make Concrete Posts | Loan to Open Cardboard Box Factory | Aluminum Frame Business Plan | Hot Galvanizing For Sale | Floor Plan of a Dental Prosthesis Laboratory | Ice Cream Shop Floor Plan | Ready-made Company Project | Ready-Made Work on How to Set Up and Maintain a Bicycle Shop | Standard Operating Procedure for Food | Restaurant Project Template | Hairdresser Flowchart | I opened a funeral home | Step by Step Guide to Setting Up a Van Rental Company | How to Create a Business Plan Representation | Car Dry Wash Supplier | List of Materials for Setting Up a Recording Studio | Plant Models for Pig Farm | Industrial Cake Production | Eucalyptus Oil Flowchart | How to Set Up an Acai Factory | Hot Sauce Manufacturers | Pet Shop Reception Projects |
Other projects ready:
How to start Shed for Bovine Confinement (Milk Cattles) in a Confinement Regime, with capacity for 250 animals and area of 1.000 m² and Mecanic Milking for 12 animals (area with 200 m²).
Project Factory to Produce Dehydrated Fruits (Raisin Banana, Raisin Grape, Prune, Dry Peach and others) with capacity for 5.000 Kg per day.
PDF Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 20 animals/day.
Plant and layout Cold Meat Production (Bovines, Swines, Caprines, Ovines and Ostrich) with Carcass Reception and capacity to produce 1.000 Kg/day
Project Swine Farm (with Overlapping Bed) with capacity to Produce 112 Matrix.
Project Clothing Industry to Produce Shorts with Laundry Sector (Stone Wash) with capacity for 50 garments/day.
FeasibilityClothing Industry to Produce Tactel Pants and Jackets with capacity for 500 garments/day.
Business plant Tannery Caprine Skin with capacity to Produce 100 skins/day.
Project Tire Recapping with capacity for 100 tires per day.
How to start Wood Chips and Sawdust with capacity for 5 tons/day.



