Ready project Factory to Produce Alcohol Gel with capacity for 10.000 liters/day.
CODE - IND-075
Ready project Factory to Produce Alcohol Gel with capacity for 10.000 liters/day.
CODE - IND-075Project ready with:
Industry with the following sections:Reception of Raw Material
Storage of Raw Material
Milling
Fermentation
Distillation
Packages
Storage for Finished Products
Expedition
Office
Dressing Rooms
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Alcohol Gel
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Alcohol Gel with capacity for 10.000 liters/day.
- Business plan for Factory to Produce Alcohol Gel with capacity for 10.000 liters/day.
- 3D project of Factory to Produce Alcohol Gel with capacity for 10.000 liters/day.
Projects with other capacities
Factory to Produce Alcohol Gel
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Project for Manufacturing Alcohol Gel | Flowchart for the manufacture of alcohol gel | What Do I Need to Set Up a Gel Factory? | Alcohol Gel Flowchart | Alcohol Gel Production Flowchart | Alcohol Gel Flowchart | Alcohol Gel Factory Layout | Manufacturing of Alcohol Gel in the Model Industry | Alcohol Gel Flowchart | Alcohol Gel Flowchart | Alcohol Production Layout | Alcohol Gel Production Flowchart | Standard Honey House Plan | Models of Corrals for Separating Cattle | How to Stock Soaps from a Factory | I Want to Open a Sportswear Store | Organizational Chart of a Vehicle Rental Company | Car Dealership Business Plan | Chocolate Shop Floor Plan | Jewelry Store Design | Documents Required to Set Up a Tannery | Order to Set Up a Physical Drugstore Area | Music School Music School Project | Turtle Model Flowchart | What Should I Do to Open a Burger Shop? | Football Field Floor Plan | How to Create an Organizational Chart for an Operating Room | Flowchart of a Physiotherapy Clinic Company | Make a Floor Plan of a Uti | How to Set Up a Party Decoration and Entertainment Company | How to Create a Drawing Form Using Supermarket Products | How to Set Up a Ballroom Dance Project | Bowling Alley House Floor Plans | Car Wash Flowchart Examples | How to Create an A La Carte Restaurant | Bath Salts Raw Material | Which Countries Produce Vegetable Loofah? | Step by Step Guide to Setting Up a Faction | Underwear Manufacturing Initial Investment | Setting Up a Factory Flowchart | Plastic Wood Making Machine | Project with MDF | Flowchart of a Precast | How to Start a Cardboard Box Factory | How to Set Up a Vehicle License Plate Printing Business | What Do You Need to Open an Aluminum Furniture Factory? | Model Photographic Laboratory | Milk Powder Production Machinery | Dispatch and Reception of Mineral Water | Sale of Material for Manufacturing Automotive Batteries | Supplier Qualification Pop Model | Pop Laboratory of Clinical Analysis Water | Carrier Organization Chart | Forest Nursery Financing | Billboard Mounting Company | Layout for Quick Print Shop | Setting Up a Home-Based Barbecue Business | Ice Cream Shop Refrigeration Project | Manual for the Layout of a Frozen Pizza Dough Factory | How to Make a Model of a Winery | Japanese Peanut Manufacturing | Yogurt Production Business Plan | I Want to Build a Garden Cemetery |
Other projects ready:
How to start Factory to Produce Baked and Frozen Cheese Bread, with an area of 260 m² and capacity for 3.000 kg/day.
Project Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups with a machine to make PET Bottles.
PDF Factory to Produce Garapa (Sugar Cane Juice), with capacity for 5.000 liters/day.
Plant and layout Aesthetic Center with capacity for 10 people.
Project Industrial Bakery to Produce Frozen French Bread with capacity for 500 Kg/day.
Project Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
FeasibilityIndustry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 20 liters.
Business plant Factory T-Shirt Screen Printing with capacity for 200 garments/day.
Project Milk and Dairy Industry to Produce Ultrafiltration Fresh Cheese with capacity for 30.000 liters of Milk per day.
How to start Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water with a machine to make PET Bottles.



