Ready project Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day.

CODE - LTC-068

Ready project Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day.

CODE - LTC-068


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Production and Packing Section
Chamber for Packed Products
Packing
Expedition
Storage for Packages
Storage for Ingredients
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Chocolate Powder

How to start Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Chocolate Powder

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Chocolate Company Name | Chocolate Powder Company | Chocolate drink Company name | Packaging Production for Chocolate Powder | Chocolate Powder | Chocolate Company | Farm Chicken | Flowchart of a Truffle | Manufacture Cosmetics | Parts to assemble a hardware | Cosmetics Stores - Layout | Fuel Pumps for Setting Up a Station for Sale | Cafe Expresso Business Projects | Landscaping Company Layout | Surfing Company Business Plan | Gingerbread Project Structure Model | Pharmacy C3b4nica Plants | Rubber Powder Manufacturing | How to Set Up an English Course | Plan of a Beef Boning Room | Prices for Construction of Football Society | Financing to Set Up a Radiology Clinic | Financial Plan of a Medical Clinic | Industrial Kitchens Projects Poa | List of materials for a 70m2 house | Hotel Floor Plan Templates | Pizzeria Model Project | Home Rest Business Plan | Horse stall design | Industrial Project | Stone Cutting Techniques for the Laboratory | Dearte Project With Papier-Marche | Bikini Manufacturing and Store | Tennis Manufacturing Flowchart | How to Start a Cell Phone Case Business | Ecological Charcoal Production Flowchart | Assemble Lumberyard | Concrete Block Manufacturing Plant | Barbecue 3d Dwg | Raw Material for Manufacturing Expanded Clay | Material Manufacturing Cages | Equipment for Setting Up a Microbiology Laboratory | Cheese Production Flowchart | What is Dml Laundry | Car Workshop Name Suggestions | How to Make a Soap Skate Park | Pops Ready Models | Cosmetics Company Hygiene Manual | Ready Optical Business Plan | Travel Agency Services Flowchart | Construction Project | What Materials Are Needed to Open a Home Appliance Technical Assistance Store? | How to Set Up a Cleaning Agency | Feed and Mineral Salt Plant Projects | Ceramic Industry Floor Plan | French Bread Making Machine | Corn Snack Factory BPF | How to Grow Mushrooms in a Greenhouse | Banana Chips Factories | Physical Arrangement of the Pharmaceutical Industry |

 

Other projects ready:

How to start Farm to Produce Quail Eggs with capacity for 10.000 Eggs per day.
Project Cold Storage Room to Produce Frozen and Threaded Fishes with Factory for Breaded Fish and Fish Products with capacity for 20.000 Kg/day.
PDF Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with White Mould (Camembert, Brie), with capacity of 8000 liters/day.
Plant and layout Factory to Produce Chocolate Powder with capacity for 10.000 Kg/day.
Project Unit for Immedaytely Emergency Services of Low and Average Complexity, with capacity for 50 beds.
Project Clothing Industry to Produce Leather Clothes with capacity for 300 garments/day.
FeasibilityClothing Industry to Produce T-Shirts with Printing Sector and with capacity for 200 garments/day.
Business plant Cold Storage Room for Frozen Fish Processing with area of 2.500 m² (2990 sq.yd) and capacity for 50.000 kg/day.
Project Small Factory of Cachaça (Liquor), Liqueur and Distilled (Cognaque) with an area of 200 m² and capacity for 500 liters/day.
How to start Factory to Produce Mead with capacity for 5.000 liters/day.

Project - how to start Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day.