Ready project Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day.

CODE - LTC-068

Ready project Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day.

CODE - LTC-068


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Production and Packing Section
Chamber for Packed Products
Packing
Expedition
Storage for Packages
Storage for Ingredients
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Chocolate Powder

How to start Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Chocolate Powder

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Chocolate drink Company name | Chocolate Company Name | Chocolate Company | Chocolate Powder Company | Packaging Production for Chocolate Powder | Chocolate Powder | Farm Chicken | Flowchart of a Truffle | Manufacture Cosmetics | Parts to assemble a hardware | Cosmetics Stores - Layout | Fuel Pumps for Setting Up a Station for Sale | Cafe Expresso Business Projects | Landscaping Company Layout | Surfing Company Business Plan | Gingerbread Project Structure Model | Pharmacy C3b4nica Plants | Rubber Powder Manufacturing | How to Set Up an English Course | Plan of a Beef Boning Room | Prices for Construction of Football Society | Financing to Set Up a Radiology Clinic | Financial Plan of a Medical Clinic | Industrial Kitchens Projects Poa | List of materials for a 70m2 house | Hotel Floor Plan Templates | Pizzeria Model Project | Home Rest Business Plan | Horse stall design | Industrial Project | Stone Cutting Techniques for the Laboratory | Dearte Project With Papier-Marche | Bikini Manufacturing and Store | Tennis Manufacturing Flowchart | How to Start a Cell Phone Case Business | Ecological Charcoal Production Flowchart | Assemble Lumberyard | Concrete Block Manufacturing Plant | Barbecue 3d Dwg | Raw Material for Manufacturing Expanded Clay | Material Manufacturing Cages | Equipment for Setting Up a Microbiology Laboratory | Cheese Production Flowchart | What is Dml Laundry | Car Workshop Name Suggestions | How to Make a Soap Skate Park | Pops Ready Models | Cosmetics Company Hygiene Manual | Ready Optical Business Plan | Travel Agency Services Flowchart | Construction Project | What Materials Are Needed to Open a Home Appliance Technical Assistance Store? | How to Set Up a Cleaning Agency | Feed and Mineral Salt Plant Projects | Ceramic Industry Floor Plan | French Bread Making Machine | Corn Snack Factory BPF | How to Grow Mushrooms in a Greenhouse | Banana Chips Factories | Physical Arrangement of the Pharmaceutical Industry |

 

Other projects ready:

How to start Factory to Produce Fish Flour and Fish Oil with capacity for 10.000 Kg/day.
Project Industry of Ice Production in cubes with capacity for 15.000 Kg/day.
PDF Salon for Feet Treatment with capacity for 100 people.
Plant and layout Factory to Produce Pequi Paste and Canned Pequi with capacity for 1.000 Kg per day
Project Smoker with capacity to produce 10 Kg/day.
Project Factory to Produce Bran Fodder for Fishes, Cats and Dogs with capacity for 20.000 Kg/day.
FeasibilityFactory to Produce Frozen Fruit Pulp with capacity for 300 Kg/day.
Business plant Cold Storage Room to Process ALIVE and Stunned Shrimps and Fresh, Frozen and Breaded Fishes and Fish Hamburguers with capacity to Produce 10.000 Kg/day.
Project Factory to Produce Dough of Baked and Frozen Cheese Bread with capacity for 5.000 Kg/day.
How to start Clothing Industry to Produce Shorts with Laundry Sector (Stone Wash) with capacity for 50 garments/day.

Project - how to start Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day.