Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Soap Powder with capacity for 3.000 Kg/day.
CODE - CM-060
Ready project Factory to Produce Soap Powder with capacity for 3.000 Kg/day.
CODE - CM-060
Project ready with:
Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Room to Mixture the Ingredients
Drying Room
Packing Room
Stocking of Finished Products
Stocking of Products in Observation
Office
Canteen
Dressing Room
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Soap Powder
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Soap Powder with capacity for 3.000 Kg/day.
Business plan for Factory to Produce Soap Powder with capacity for 3.000 Kg/day.
3D project of Factory to Produce Soap Powder with capacity for 3.000 Kg/day.
Projects with other capacities
Factory to Produce Soap Powder
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Ready Made Soap Factory Business Plan
|
Powder Soap Industry
|
Academic Work on Washing Powder
|
Laundry Detergent Business Plan
|
Academic Work Industrial Assembly
|
Project for Laundry Detergent Company
|
How to Find a Financial Business Plan for a Soap Powder Factory
|
Academic Work on Soap
|
Major Industries In Soap Work
|
Soap Business Plan
|
Soap Business Plan
|
Online Store of Machines for Slaughtering Free-Range Chickens
|
Cosmetics Manufacturing Machines
|
Motorcycle Parts Store Layout
|
Set Up Motorcycle Parts Store
|
Setting Up A Roast Chicken Sale Is A Good Business
|
Project for Fish Market
|
I Want to Provide Air Conditioning Services
|
Design Templates for Children's Stores
|
Basic Food Basket Assembly Project
|
Model Design of a Day Center for the Elderly
|
Flowchart of a Cattle Slaughterhouse
|
Industrial Coxinha Filling
|
What Materials Are In The Cleaning Room Of The Material And Sterilization Center?
|
Psf Project
|
Ambulance Acquisition Project Template
|
Gym Floor Plan Templates
|
Business Plan Pousada Mg
|
I Would Like to See a School Cook Test Template
|
Budget to Open a Dance Club
|
I Want to Set Up a Barbecue Bar
|
Building Plan DWG Dwg
|
Tablet Production Room
|
Setting Up a Retreading Machine
|
Assemble Panty and Lingerie Manufacturing
|
String Making Machines
|
Mini-factory of plastic bags and sacks
|
What It Takes to Start a Styrofoam Manufacturing Business
|
Broom Handle Making Machine Project
|
How to Make a Match Factory
|
Flowchart for Mortar Manufacturing
|
How Bingo Cards Are Made in Graphics
|
Anodizing Ebook
|
Small Machining Project
|
Dental Prosthetics Manufacturers
|
How to Set Up a Milk Bagging Factory
|
Good Practices Manual Template for Industry in General
|
Rubber Facades
|
Production of Preserved Quail Eggs
|
Pop Hospital Standard Operating Procedures
|
How Much Does It Cost to Set Up a Gas Tank
|
How to Manage a Manjcurer
|
Open Car Agency
|
Accounting Office Facades Template
|
Set Up Fire Extinguisher Refilling Company
|
Equipment for Hot Dog Kiosks
|
Floor Plan for Pig Farm
|
Cereal Bar Wikipedia
|
Bread Factory Plant
|
Pepper Factory Equipment
|
Grain Project Model
|
Dog Bone Factory
|
Other projects ready:
How to start Tanning Ostrich Skin with capacity to Produce 300 Skins per day.
Project Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 10.000 Kg/day.
PDF Sterilization Unit (by Low Temperature Steam and Formaldehyde) with capacity for 200.000 Units per day.
Plant and layout Bottling Industry of Mineral Water with capacity for 40.000 liters/hour, in flagons of 20 litrers and 10 liters, botlles of 2 liters, bottles of 600 ml with and without gas and plastic cup, with an area of 800 m².
Project Factory to Produce Extruded Fodder for Fishes, Cats and Dogs with capacity for 500 Kg/day.
Project Cold Storage Room to Produce Salted Fish and Fish Products with capacity for 5.000 Kg/day.
FeasibilityHospital Waste Incinerator with capacity for 13.000 Kg/day.
Business plant Factory to Produce Paprika (grounded red) with capacity for 500 Kg/day.
Project Factory to Produce Corn Flakes with capacity for 5.000 Kg per day.
How to start Factory for Dried Tomato with 150 m² (179,4 sq.yd.) area and capacity of 1.000 kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US