Ready project Factory to Produce Wax with capacity for 100 Kg/day.
CODE - CM-143
Ready project Factory to Produce Wax with capacity for 100 Kg/day.
CODE - CM-143Project ready with:
Industry with the following sections:Reception of Raw Material
Storage for Raw Material
Storage for Packages
Wax Production
Storage for Finished Products
Storage for Products in Observation
Offices
Canteens
Dressing Room
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Wax
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Wax with capacity for 100 Kg/day.
- Business plan for Factory to Produce Wax with capacity for 100 Kg/day.
- 3D project of Factory to Produce Wax with capacity for 100 Kg/day.
Projects with other capacities
Factory to Produce Wax
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Sera Depilatory 100kg Pressure | Ready-made Works on Depilatory Wax | Depilatory Wax Equipment | Academic Work About Factory | Project to assemble an auto parts store | How to Start an Adventure Sports Company | Bank Branch Layout | Project to Set Up Candy Stores | How Much Does It Cost to Set Up a Small Orthopedic Products Store? | Pe De Moleque Manufacturing | Project for opening a company2fdrogaria | Music School Assembly | Layout of a Chicken Slaughterhouse | Butcher Shop Business Plan | Olympic Center Dwg | I Want to See a Floor Plan of a Surgical Center | Physiotherapy Floor Plan | How to Draw a Gym Layout | Bar and Restaurant Budget Template | Ballet Class Quotes | Costs to Set Up a Bowling Alley | Car Wash Project Templates | Poços De Caldas Hotels for the Elderly | What is Required to Open a Water Analysis Laboratory | Fireworks Manufacturing Planning | How to Set Up a Disposable Clothing Factory | What We Need to Set Up a Disposable Cup Factory | Recycling Plant Model | Autoclaves for Wood | How to Incorporate a Premolded Company | Electric Heater Industry | Making Paper Candy Molds | Iron Beams for Ready-to-Build Construction | Chemical Laboratory Floor Plan | UHT Dairy | Automotive Service Stores Floor Plan | Standard Operating Procedures for Drug Distributors | Standard Operating Procedure in the Clinical Analysis Laboratory | How to Set Up a Bus Company | Call Center Layout | Laminating Projects | How to Set Up a School Transportation Company | Physical Arrangement of the Fruit Industry | How to Set Up a Pastry Factory | Sand Extraction Model Project | French Fries Business Plan | Guarana Powder Production Flowchart | Companies That Produce Peanut Oil | Tomb model |
Other projects ready:
How to start Factory to Produce Cellulose Powder para fins farmacêuticos with capacity for 1.000 Kg per day.
Project Factory to Produce Furniture with an area of 500 m2.
PDF Clothing Industry to Produce Female Tencel Jeans Pants with capacity for 1.000 garments/day.
Plant and layout Factory to Produce Energy Drinks with capacity for 30.000 liters/day.
Project Factory to Produce Macaroni Rice with capacity for 1.000 Kg/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, with capacity for 1000 liters/day.
FeasibilitySlaughterhouse Bovines, Swines, Caprines, Ovines, Equines and Ostrich with capacity for 5 animals per day.
Business plant Improvement Unit of Seeds used to Feed Livestock with capacity for 10.000 Kg/day.
Project Factory Improvement of Vegetables (lettuce, acelga (swiss chard), borecole, cabbage, carrot, beetroot, cucumber, beans-string bean, cauliflower and broccoli) with capacity to produce 3.000 Kg per day.
How to start Factory to Produce Concrete Blocks and Pierced Bricks (3.000 units per day), Premolded and Premolded Rock Soil (300 m2/day).



