Ready project Industry to Produce Body Soap with capacity for 500 kg/day.

CODE - CM-045

Ready project Industry to Produce Body Soap with capacity for 500 kg/day.

CODE - CM-045


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Body Soap and Soap in Bars Production
Stocking of Finished Products
Stocking of Products in Observation
Offices
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industry to Produce Body Soap

How to start Industry to Produce Body Soap with capacity for 500 kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industry to Produce Body Soap

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Start Soup Industry | Ready-Made Chicken Shed Projects | Dairy Cattle Shed | Equipment Used In Perfume Production | Business Plan for Cell Phone Store | How a Battery Distributor Works | University Work on Paints | How to Set Up a Supplement Store | How to Open a Mattress Store | Clothing Store Floor Plan Template | Machine for Making Candy and Lollipops | Pharmacy Plants | Garbage Recycling Factory Layout | Reinforcement School Model | Feasibility of a Cattle Slaughterhouse | How to Start a Skewers Business | I Want to Build a Society Field | Physiotherapy Clinic Layout | Set up Radiology Service | Flowchart Designs For A Bodybuilding Gym | Summer Camp Business Plan | Ready-made Fish and Pay Project Templates | Cachaça Plant | Floor Plan Of A Car Wash | Pharmaceutical Company Layout | Production of artisanal cigarettes | Shirt Production Project | Plastics Industry Ideas Project | Furniture Store Business Plan | Assemble Concrete Block Factory | How Sefaz Manufactures Mattresses | How to Set Up a Bag Factory | How to Assemble an Aluminum Foil Packaging | Parmesan Dairy Products in Brazil | Motorhome Manufacturing Project | Popular House Projects Dwg | Pop Examples 01 Cleaning of Utensils and Equipment | Pop Pest Control and Disinfestation | How to Set Up a Key Shop | Setting Up An Ecotourism Project | Construction Company Cost Presentation Template | Stage Assembly Equipment | Where to Find Frog Farming in Santa Catarina | Ice Cream Making | Confectionery Business Plan | How to Set Up an Irrigation Shop | Spaghetti with Pequi | How to Make Pamonharia | Salon and Beauty Projects |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
Project Cinema (Exibition Room) with capacity for 500 people (2 rooms) .
PDF Factory to Produce Vinegar made from Apple with capacity for 500 liters/day.
Plant and layout Factory to Produce Gauze Compress (without Sterilization) with an area of 250 m².
Project Factory to Produce Crystallized Candies with capacity for 10.000 kg/day.
Project Slaughterhouse Bovines and Swines and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) and Charque Processing with capacity to Produce 800 animals/day.
FeasibilityTanning Ovine Skin with capacity to Produce 1.000 skins per day.
Business plant Factory to Produce Concrete Lamppost with capacity for 100 units/day.
Project Factory to Produce Pine Nut Flour with capacity for 500 Kg per day.
How to start Slaughterhouse Cold Meat Production and Smoked Products, with an area of 400 m2, and capacity for 7000 kg/day.

Project - how to start Industry to Produce Body Soap with capacity for 500 kg/day.