Ready project Industry to Produce Body Soap with capacity for 500 kg/day.
CODE - CM-045
Ready project Industry to Produce Body Soap with capacity for 500 kg/day.
CODE - CM-045Project ready with:
Industry with the following sections:Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Body Soap and Soap in Bars Production
Stocking of Finished Products
Stocking of Products in Observation
Offices
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Industry to Produce Body Soap
OPTIONAL SERVICES:
- Financial Feasibility Study of Industry to Produce Body Soap with capacity for 500 kg/day.
- Business plan for Industry to Produce Body Soap with capacity for 500 kg/day.
- 3D project of Industry to Produce Body Soap with capacity for 500 kg/day.
Projects with other capacities
Industry to Produce Body Soap
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Start Soup Industry | Ready-Made Chicken Shed Projects | Dairy Cattle Shed | Equipment Used In Perfume Production | Business Plan for Cell Phone Store | How a Battery Distributor Works | University Work on Paints | How to Set Up a Supplement Store | How to Open a Mattress Store | Clothing Store Floor Plan Template | Machine for Making Candy and Lollipops | Pharmacy Plants | Garbage Recycling Factory Layout | Reinforcement School Model | Feasibility of a Cattle Slaughterhouse | How to Start a Skewers Business | I Want to Build a Society Field | Physiotherapy Clinic Layout | Set up Radiology Service | Flowchart Designs For A Bodybuilding Gym | Summer Camp Business Plan | Ready-made Fish and Pay Project Templates | Cachaça Plant | Floor Plan Of A Car Wash | Pharmaceutical Company Layout | Production of artisanal cigarettes | Shirt Production Project | Plastics Industry Ideas Project | Furniture Store Business Plan | Assemble Concrete Block Factory | How Sefaz Manufactures Mattresses | How to Set Up a Bag Factory | How to Assemble an Aluminum Foil Packaging | Parmesan Dairy Products in Brazil | Motorhome Manufacturing Project | Popular House Projects Dwg | Pop Examples 01 Cleaning of Utensils and Equipment | Pop Pest Control and Disinfestation | How to Set Up a Key Shop | Setting Up An Ecotourism Project | Construction Company Cost Presentation Template | Stage Assembly Equipment | Where to Find Frog Farming in Santa Catarina | Ice Cream Making | Confectionery Business Plan | How to Set Up an Irrigation Shop | Spaghetti with Pequi | How to Make Pamonharia | Salon and Beauty Projects |
Other projects ready:
How to start Factory to Produce Soap Powder with capacity for 1.000 Kg/day.
Project Slaughterhouse for Swine - 75 animals/day - area of 800 m² (956,8 sq.yd).
PDF Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 5000 liters/day.
Plant and layout Café with capacity for 30 people.
Project Malharia with capacity for Production para 300 pieces por day.
Project Factory to Recycle Paper with capacity for 10.000 Kg/day.
FeasibilityHospital Waste Incinerator with capacity for 20.000 Kg/day.
Business plant Factory to Produce Blocks of Polystyrene Isopor.
Project Malharia with capacity for Production para 50 pieces por day.
How to start Slaughterhouse Swines with capacity for 600 animals/day.



