Ready project Tannery Frog Skin with capacity to Produce 3.000 skins/day.

CODE - CTM-047

Ready project Tannery Frog Skin with capacity to Produce 3.000 skins/day.

CODE - CTM-047


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 3.000 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Financing for Tannery | Small Detergent Factory | I Want to Know the Costs of Setting Up a Lubricant and Oil Store | What Do I Need to Set Up a Roast Shop? | Bakery Floor Plan Layout | Learn How to Sell Awnings | Country Store Project | Chocolate Company Business Plan | Beverage Company Business Plan | Nursery Documentation | Sewage Treatment Plant Project for Small Business | Legislation for Pururuca Factory | Breaded Fish Refrigerator | Physiotherapy Project Templates for Apae | How to Set Up an Incineration Company | Hospital Waste Project | Small Motel Silver | Models of How to Set Up a Pastry Shop | I need lunchbox | Dry Sauna Project | Financial Plan of a Video Rental Store | Analysis of Plant Biochemistry | Glass Recycling Plants | Flowchart for Making Jeans | I Want to Open a Raffia Bag Business | PVC lining 500 | Address Of Styrofoam Companies In China | Briquette Factories In Poços De Caldas | Pallet Projects | How Much Does It Cost to Open a Plaster Warehouse? | Notebook Production Project Schedule | Metalworking Floor Plan Layout | Cylinder Manufacturing Process | Soil Analysis Laboratories For Sale | Butter Factory Business Ideas | GMP Manual In Portuguese | Floor Plan for Disabled Washroom .dwg | Egg Pasteurizing Machine | Pop Hospital Model | What Do I Need to Set Up a Gas Distributor? | Hydroponics Design Project | I would like to finance an orange juice machine | Collection Office Business Plan | Upholstery Material | Notary Sets Up Notary Office | Making Cakes | What It Takes to Set Up a Bakery | What It Takes to Set Up a Palm Heart Factory | How to Set Up a Processing Unit | Budget for Cajuina Production | Equipment Needed to Set Up a Dog Hotel |

 

Other projects ready:

How to start Factory to Produce Corn Flour with capacity for 42.000 Kg per day (Vertical Mill)
Project Cold Storage Room Shrimp Processing with an area of 300 m² (358,8 sq.yd) and capacity for 3.000 kg/day. Reception area for Living Shrimps.
PDF Cachaça (Liquor) Factory, with an area of 150 m² and capacity for 200 liters/day. (To be built in a flat land).
Plant and layout Factory to Produce Powder Cheese Bread with capacity for 300 Kg/day.
Project Caprine Area with capacity for 90 Caprines, Including: Breeding and Milking.
Project Swim School with capacity for 1.000 alunos per day.
FeasibilityFactory to Produce Garlic Paste with capacity for 5.000 Kg per day.
Business plant Cold Storage Room to Produce Mollusks (Oysters, Mussels) and Seafoods with capacity for 10.000 Kg/day.
Project Factory to Produce Dog Biscuits with capacity for 3.000 Kg/day.
How to start Factory to Produce Pasteurized Liquid Egg with capacity for 500 liters/day.

Project - how to start Tannery Frog Skin with capacity to Produce 3.000 skins/day.