Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Tanning Fish Skin with capacity to Produce 1.000 skins per day.
CODE - CTM-037
Ready project Tanning Fish Skin with capacity to Produce 1.000 skins per day.
CODE - CTM-037
Project ready with:
Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Fish Skin
OPTIONAL SERVICES:
Financial Feasibility Study of Tanning Fish Skin with capacity to Produce 1.000 skins per day.
Business plan for Tanning Fish Skin with capacity to Produce 1.000 skins per day.
3D project of Tanning Fish Skin with capacity to Produce 1.000 skins per day.
Projects with other capacities
Tanning Fish Skin
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
|
Set up a Creme Mel Ice Cream Shop
|
Construction of a Shed for Confinement of Dairy Cattle
|
Soap Powder Line Layout
|
Cell Phone Store Plant
|
I Want to Set Up a Store to Sell Batteries
|
Newsstand Projects
|
Setting Up an Oriental Products Store
|
Party Supply Store Layout
|
Project to Open a Clothing Store
|
What is the layout of bullet manufacturing?
|
Drugstore Finance
|
Waste Separation Equipment
|
How to Set Up a Private Reinforcement Room
|
Table Cattle2c Pigs2c Sheep and Goats
|
Open a Skewers Factory
|
Ready Projects for Soccer Fields
|
How to Set Up an Acupuncture Room
|
What Equipment Is Needed in a Physiotherapy Office?
|
Bodybuilding Gym Project In DWG
|
Restaurant Plant Designs
|
Theme Park Budget Spreadsheet
|
Set Up a Bowling Alley in Your City
|
Car Wash Ramp Dwg
|
Financing for Absorbent Factory
|
How to Design a Toy
|
What Is The Initial Investment In A T-Shirt Factory?
|
Plastic Packaging Production Flowchart
|
Plastic Fasteners Manufacturers
|
Ready Made Furniture Projects In CAD
|
Pre-molded Machine
|
View Gate Drawings and How to Make Them
|
Mold of a Paper Factory
|
Examples of Ready-Made Projects in Refrigerator Production
|
Luminaire Production
|
Cold Room Dairy Industry
|
Motor Home How to Assemble
|
One Bedroom Suite House Plans
|
How To Make A Pop 28Standard Operating Procedure29 From A Cleaning Cloth
|
Model of a Standard Operating Program in the Area of Pest Control
|
Investment Schedule of a Travel Agency
|
Pizzeria Management
|
Project Template for Computer Company
|
How to Set Up a Jewelry Studio
|
L-Shaped Warehouse Floor Plan
|
Construction of a Shed for Raising Cattle
|
Formula for Making Ice Cream
|
How to Set Up a Pie Factory
|
Viability of Creating a Construction Material Company
|
Names for Popcorn Factories
|
Palm Oil Mill Equipment
|
Animal Project Template
|
Other projects ready:
How to start Factory to Produce Freeze-Drying Food with capacity for 1.000 Kg/day.
Project Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
PDF Factory to Produce Cone for Ice Cream with capacity for 3.000 kg/day.
Plant and layout Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 500 Kg/day.
Project Factory to put Cachaça (Liquor) in bottles, with capacity for 5.000 liters/day.
Project Clothing Industry to Produce Heavy Fabrics (Canvas) with capacity for 100 garments/day.
FeasibilityMilk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 20.000 liters/day.
Business plant Factory Casting of Cinereous Iron with capacity for 500 Kg/day.
Project Factory to Produce Synthetic Marble with Plastic Resin with capacity for 1.000 pieces per day.
How to start Factory to Produce Wood Briquette with capacity for 5.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US