Ready project Tanning Fish Skin with capacity to Produce 1.000 skins per day.

CODE - CTM-037

Ready project Tanning Fish Skin with capacity to Produce 1.000 skins per day.

CODE - CTM-037


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Fish Skin

How to start Tanning Fish Skin with capacity to Produce 1.000 skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Fish Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Set up a Creme Mel Ice Cream Shop | Construction of a Shed for Confinement of Dairy Cattle | Soap Powder Line Layout | Cell Phone Store Plant | I Want to Set Up a Store to Sell Batteries | Newsstand Projects | Setting Up an Oriental Products Store | Party Supply Store Layout | Project to Open a Clothing Store | What is the layout of bullet manufacturing? | Drugstore Finance | Waste Separation Equipment | How to Set Up a Private Reinforcement Room | Table Cattle2c Pigs2c Sheep and Goats | Open a Skewers Factory | Ready Projects for Soccer Fields | How to Set Up an Acupuncture Room | What Equipment Is Needed in a Physiotherapy Office? | Bodybuilding Gym Project In DWG | Restaurant Plant Designs | Theme Park Budget Spreadsheet | Set Up a Bowling Alley in Your City | Car Wash Ramp Dwg | Financing for Absorbent Factory | How to Design a Toy | What Is The Initial Investment In A T-Shirt Factory? | Plastic Packaging Production Flowchart | Plastic Fasteners Manufacturers | Ready Made Furniture Projects In CAD | Pre-molded Machine | View Gate Drawings and How to Make Them | Mold of a Paper Factory | Examples of Ready-Made Projects in Refrigerator Production | Luminaire Production | Cold Room Dairy Industry | Motor Home How to Assemble | One Bedroom Suite House Plans | How To Make A Pop 28Standard Operating Procedure29 From A Cleaning Cloth | Model of a Standard Operating Program in the Area of Pest Control | Investment Schedule of a Travel Agency | Pizzeria Management | Project Template for Computer Company | How to Set Up a Jewelry Studio | L-Shaped Warehouse Floor Plan | Construction of a Shed for Raising Cattle | Formula for Making Ice Cream | How to Set Up a Pie Factory | Viability of Creating a Construction Material Company | Names for Popcorn Factories | Palm Oil Mill Equipment | Animal Project Template |

 

Other projects ready:

How to start Milk and Dairy Industry for Fresh Cheeses (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Yogurt, milk Beverages, with capacity of 3000 liters/day.
Project Cold Storage Room to Produce Fresh, Frozen, Salted, Dried, Smoked and Breaded Fishes, Hamburgers and Fish Products with capacity for 5.000 Kg/day.
PDF Factory Casting of Cinereous Iron with capacity for 5.000 Kg/day.
Plant and layout Footwear Industry to Produce Boots with capacity for 500 pairs/day.
Project Factory to Produce Dough of Frozen Cheese Bread with capacity for 1.000 Kg/day.
Project Clothing Industry to Produce T-Shirts with Printing Sector and with capacity for 300 garments/day.
FeasibilityFactory to Produce Macaroni for Fresh and Dry Pasta with capacity for 1.000 kg/day.
Business plant Factory to Produce Corn Juice with capacity for 5.000 liters per day.
Project Slaughterhouse Ostrich Slaughter with capacity for 50 animals/day.
How to start Factory to Produce Wine, with capacity for 300.000 liters/year.

Project - how to start Tanning Fish Skin with capacity to Produce 1.000 skins per day.