Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory Bean Improvement with capacity to produce 1.000 Kg per day.
CODE - VEG-085
Ready project Factory Bean Improvement with capacity to produce 1.000 Kg per day.
CODE - VEG-085
Project ready with:
Industry with the following sections:
Reception Platform
Storage for Grains
Classification and Cleaning of Grains
Reception of Remains
Improvement Room
Employees Entrance
Storage for Packages
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory Bean Improvement
OPTIONAL SERVICES:
Financial Feasibility Study of Factory Bean Improvement with capacity to produce 1.000 Kg per day.
Business plan for Factory Bean Improvement with capacity to produce 1.000 Kg per day.
3D project of Factory Bean Improvement with capacity to produce 1.000 Kg per day.
Projects with other capacities
Factory Bean Improvement
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Bean Processing Plant
|
Bean Reception Platform
|
Stable Models
|
Soap Bar Manufacturing Is A Good Business
|
Leayt Minimarket
|
Concrete Mixer Projects
|
How to Start a Business to Sell Steel
|
Name for Cold Cuts Store
|
Shoe Store Floor Plan Design
|
Screen Printing Material
|
Legislation for Pharmacy Project
|
Olive Technology
|
Budget to Open a Children's School
|
A Sheep Farming Company
|
Sun-dried Meat Flowchart
|
Multi-Sport Courts Dwg DWG
|
Medical Clinic Projects
|
How to Set Up a Physical Plan of a UBS
|
Ask ICU Floor Plan
|
How to Create a Steakhouse Business Plan
|
Supermarket Equipment Project 500m2
|
Timeline for Starting a Gym
|
Dance Club Financing Project
|
Car Wash Project
|
How Do I Set Up a Dance Club?
|
Toothbrush Manufacturing Manual
|
Spray Paint Production
|
Industrial Facades
|
How to Start a Leather Bag Business
|
Building Glass Factory
|
Assembling a 500-liter water cooler
|
School Furniture Project
|
Plans for the Construction of a Concrete Plant
|
Price of cardboard tubes for construction work
|
Cost to Make an Aluminum Pan
|
I Want to Set Up an Exhaust Replacement Company
|
Plant for Veterinary Clinical Analysis Laboratory
|
How to Set Up a Dairy
|
Sparkling Wine Filler
|
Budget for Setting Up a Parking Lot
|
Pop Standard Operating Procedure Sac39ade Plans
|
Limpasa Lab Clinical Analysis
|
Beauty Salon Floor Plan
|
Documents to Register a Nursery
|
Setting Up A Tracking Company
|
Topography Business Plan
|
Refrigeration Workshop How to Assemble
|
How to Set Up a Music Recording Company
|
Cold Rooms for Fruit Pulpsbolchoes
|
Ice Cream Cone Makers
|
Canned Corn Industry
|
How to Set Up a Medium-Sized Ice Factory
|
Tomato Extract Process Flowchart
|
Other projects ready:
How to start Microbrewery, with capacity for 750 liters/day.
Project Factory to Produce Pasta and Frozen Ready Dishes with capacity for 300 Kg/day.
PDF Factory to Produce Pork Rinds (Torresmo) with an area of 250 m².
Plant and layout Factory Improvement of Coconut Water (Normal Pasteurization) with capacity for 100 liters/day.
Project Fish and Pay with capacity for 300 Kg/day.
Project Factory to Produce Garlic Paste with capacity for 3.000 Kg per day.
FeasibilityFactory to Produce Condensed Soy Milk with capacity for 20.000 liters/day.
Business plant Factory to Producand Corn for Canjica with capacity for 5.000 Kg per day.
Project Industrial Bakery to Produce Frozen French Bread with capacity for 1.000 Kg/day.
How to start Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US