Ready project Factory to Produce Fiambre with capacity for5.000 Kg/day.

CODE - FRIG-143

Ready project Factory to Produce Fiambre with capacity for5.000 Kg/day.

CODE - FRIG-143


Project ready with:


Industry with the following sections:

Reception Platform
Freezing Chamber
Cold Chamber
Production Room
Mass Chamber
Cooking Room
Storage for Condiments
Packing Room
Storage for Packages
Cold Chamber for Packed Products
Expedition
Expedition Platform
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Fiambre

How to start Factory to Produce Fiambre with capacity for5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Fiambre

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Flowchart for Ham Production | Ham Manufacturing | Ham Production Flowchart | Ham Production | Ham Manufacturing Industries | Ham Manufacturing | Ham Manufacturer Brazil | Cold Meat Manufacturing Flowchart | Ham Producers in Brazil | Ham Manufacturing Process | Cleaning Products Factory Model | Motorcycle Store Facade | Store That Sells Lubricants | How to Sell Roast Chicken | Structure for a Fish Market | Air Conditioning Sales Company With Installation | Women's Clothing Store Floor Plan Template | How Do I Open a Water Distribution Company? | Nursery Plans for 100 Children | Animal Day Mockup | Sausage Production Flowchart | Codfish Schedule | Necessary to Open a Sterilization Company | How to Set Up a Nursing Station | Work Plan And Project In Gym Bodybuilding | Business Plan for Inns | Industrial Kitchen Model | Nightclubs Project | List of Utensils for Snack Bar | Example of Physical Financial Diagram of Construction Projects | Concrete Lab Layout | Paint Industry Flowchart | How to Set Up a Lingerie Factory | How Textile Factories Equipment | Project2fconsultoria for PVC Factory | Styrofoam Block Factory Vila Matilde | Broom Factory Raw Material Supplier | Match Making Machine | Set Up Mortar Factory | Paper Packaging Manufacturing Business Plan | What is needed to set up a small metalworking shop | Vacuum Metallization Suppliers | Earth Analysis Equipment | Grated Cheese Packaging Machine | Good Pharmaceutical Practices Manual | Tire Shop Project Template | Quail Eggs Enterprise | Hospital Standard Operating Procedure | I want to open a LPG gas company | Barber Shop How to Set Up One | Computer Product Companies for Representation | Accounting Office Business Plan | How to Set Up a Fire Extinguisher Refill Company | Set up a company to transport cargo | Pizzeria Service Flowchart | Garlic Bread Factory | Dry Coconut Milk Factory | Packaging Design For Powdered Juice | Dog Hotel Business Plan |

 

Other projects ready:

How to start Factory to Produce Disposable Syringe with capacity for 200.000 Syringes per day.
Project Clothing Industry to Produce Coarse Linen Shorts (cotton and flax) with capacity for 100 garments/day.
PDF Factory to Produce Cachaça dos Alemães (elaborated from the melado de cana, concentraded sugar cane juice), with capacity for 1.000 liters/day.
Plant and layout Factory to put Cachaça (Liquor) in bottles, with capacity for 5.000 liters/day.
Project Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Deboned Meat Reception) with capacity for 5.000 Kg/day.
Project Factory to Produce Banana Powder (Banana Flour), Banana Raisin, Banana Raisin with Chocolate Covering, Banana Sweet, Banana Purée with capacity for 40.000 Kg/day.
FeasibilityFactory to Produce Clothes Peg with capacity for 100 Kg/day.
Business plant Factory to Produce Soft Drink with capacity for 80.000 liters/day.
Project Factory to Produce Soy Cheese (Tofu) with capacity for 3.000 Kg per day.
How to start Factory to Produce Tomato Extract, Tomato Pulp, Dry Tomato and Ketchup with capacity for 40.000 Kg per day.

Project - how to start Factory to Produce Fiambre with capacity for5.000 Kg/day.