Ready project Factory to Produce Pastry Dough with capacity for 2.000 kg/day.

CODE - TRG-074

Ready project Factory to Produce Pastry Dough with capacity for 2.000 kg/day.

CODE - TRG-074


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Cold Chamber for Raw Material
Stocking of Additive and Ingredients
Stocking of Packages
Manufacture of Dough
Cold Chamber for Dough
Packaging
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Pastry Dough

How to start Factory to Produce Pastry Dough with capacity for 2.000 kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Pastry Dough

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Step by Step Guide to Setting Up a Pastry Dough Factory | Pastry Dough Factory | Layout for Manufacturing Powder Soap | P2f Mobile Store Projects | Battery Business Plan | Newsstand Technology | How Much Will It Cost Me to Open an Oriental Products Store? | How to Set Up a Party Supplies Store Project | Ready Project How to Set Up a Clothing Store | Hard Candy Flowchart | Compounding Pharmacy Flowchart | Recycling Project Plan | How to Set Up a School Tutoring Program | View Floor Plan of a Cattle Farm | How to Set Up a Skewers Factory | Quadra Society Bnds | Cost to Open an Acupuncture Clinic | Equip Physiotherapy Room Project | Bodybuilding Equipment Project | Bndes Bar and Restaurant | Theme Park Project | To Set Up A Bowling Alley | Regulations for Car Wash | Biscuit Making | 5dHow to Set Up a T-Shirt Factory | Flowchart of a Plastic Industry | How to Start a Plastic Clothespin Business | Business Producing Office Furniture | Material for Making Concrete Blocks | How to Open a Gate Factory | Set Up Paper Bag Factory | Make Fridge Magnet | How to Assemble Camera Refrigerator | Motorhome | Popular House Plans 2 Bedroom Condominium | How to Make Drugstore Pops | Pop Model Pest Control | Setting Up a Travel Agency for Senior Citizens | How to Open a Baby Sitter Agency | Budget for Setting Up IT Technical Assistance | Stand How to Execute Floor Plan | Frog Breeding | Ice Cream Packaging Machine | How to Set Up a Cake Shop | Worm Farm Budget | How to Set Up a Green Business | Palm Oil Industry Equipment Factories | Animal Crematorium Legislation |

 

Other projects ready:

How to start Factory for Vegetables Processing ( Dried and in powder (dehydrated garlic, dehydrated parsley, dehydrated welsh onion, dehydrated Spinach, etc), with 150m² (179,4 sq.yd.) area and capacity of 500 kg/day.
Project Leather Tannery (just until Wet Blue) with capacity to Produce 1.000 leathers/day.
PDF Factory to Produce Banana Sweet with capacity for 40.000 Kg/day.
Plant and layout Slaughterhouse Newborn Male Calves with capacity to Slaughter 20 animals/day.
Project Industry of Ice Production in cubes with capacity for 15.000 Kg/day.
Project Drugstore with an area of 200 m².
FeasibilityEgg Warehouse with capacity to Produce 5.000 dozens/day.
Business plant Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with Blue Mould (Roquefort, Gorgonzola), with capacity of 8000 liters/day.
Project Slaughterhouse Bovines and Swines and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) and Charque Processing with capacity to Produce 800 animals/day.
How to start Poultry House with capacity for 1.000 Broiler Breeders (to Produce Commercial Eggs and Selection of Eggs).

Project - how to start Factory to Produce Pastry Dough with capacity for 2.000 kg/day.