Ready project Graphical with an area of 300 m2.

CODE - PRS-040

Ready project Graphical with an area of 300 m2.

CODE - PRS-040


Project ready with:

Industry with the following sections:
Services
Storage for Papel
Storage for Paint and Pieces
Graphical (impression, cut, bookbinding, etc)
Bathroom
Dressing Room
Pantry
Administration

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Graphical

How to start Graphical with an area of 300 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Graphical

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Graphic Business Plan | Graphic Physical Arrangement | Layout Model Area 300 Square Meters | Business Plan Graphics | Graphic Physical Arrangement | Ready Flowchart of a Graphic Company | How to Make Lipstick | Auto Parts Layout | Articles for Setting Up a Fishing Shop | Bank Branch Dwg | How to Set Up a Shop to Sell Sweets | Floor Plan For Clothing Store | Peanut Butter Industry | How to Open a Homeopathic Compounding Pharmacy | Floor Plan Of A Music School | Cost Value of a Cold Storage Building Project | How Much Does It Cost to Set Up a Meat House | How and Where to Set Up a Society Court | How a Surgical Center Works | C3b4nico Project Swimming Pool Hydrotherapy Clinic Physiotherapy | Fabricate Academy | Who Sets Up A Beer Factory | Gymnasium Floor Plan Example | Start a Bowling Business | Amphitheater Project | How Much Does It Cost to Set Up a Chemical Analysis Laboratory | How to Start a Small Fireworks Business | Step by Step Guide on How to Open a Knitting Shop | Clothing Factory Plant | How to Start a Glass Cup Business | Floor Plan2c Facade Sections2c Recycling Factory Situation | Wood Treatment Plant Financing | How to Assemble Precast | Solar Heater Factory Project | Candy Mold Industry | How to Assemble Beams for Construction | Ready Project About Remedies | Dairy Profitability | Buggy Production | Popular House with 3 Bedrooms | Standard Operating Procedure Layout | Standard Operating Procedure of an Apae | How to Open a Bus Company | How to Set Up a Call Center Plan | Ready-made Restaurant Menu | What Do I Need to Open a School Transport Company? | Layout of an ice cream shop | Pastry Pastry Factory Layout | I Want to Open Sand Extraction | How to Prepare Frozen Pre-Fried Potatoes for Sale | Coconut Water Benefit | Buy Macauba Oil | How to Set Up a Crematorium |

 

Other projects ready:

How to start Factory to Produce Banana Raisin with capacity for 100.000 Kg/day.
Project Beauty Salon with an area of 50 m2.
PDF Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Sweet Milk, with capacity of 1000 liters/day.
Plant and layout Clothing Industry to Produce Caps with capacity for 300 garments/day.
Project Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 100 animals/day.
Project Slaughterhouse Buffaloes with capacity for 50 animals per day.
FeasibilityManure Storage Tank with 10 Cells.
Business plant Factory to Produce Costume Jewelry with capacity for 30.000 jewelries per day.
Project Milk and Dairy Industry to be built in 2 phases: 1st phase: Milk Packaging, with 95 m2 (113,62 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Milk Packaging, Fresh Cheeses production, Yogurt and Milky Beverage, with 200 m2 (239,2 sq.yd.) area and capacity for 8000 liters/day.
How to start Farm to Produce Quail Eggs with capacity for 5.000 Eggs per day.

Project - how to start Graphical with an area of 300 m2.